Laserfiche WebLink
i _.~_. <br />-4- <br />6. THE SURFACE WATER hONITORING PROGRRhf [JILL INCLUDE TIfE FOLLOWING MONITORING <br />FREQUENCY AND ALL WATER ANALYSES WILL BE PERFORMED USING THE PARAh1ETERS <br />LISTED BELOW: <br />MONITORING SITE <br />DESIGNATION <br />FLOW MEASUREMENT <br />FREQUENCY <br />WATER SAMPLING <br />FREQUENCY <br />S1 <br />52 <br />53 <br />MONTHLY <br />MONTHLY <br />MONTHLY <br />REQUIRED PRRAAfETERS <br />ph' (FIELD) <br />CONDUCTIVITY AT 25cc (FIELD) <br />TOT.3L DISSOLVED SOLIDS <br />2C7TAL SUSPENDED SOLIDS <br />OIL AND GREASE <br />SODIUM ABSORPTION RATIO <br />BICARBONATE <br />CALCIUh1 <br />h+AG,VESI Ubf <br />NITRATE <br />SODIUM <br />QUARTERLY <br />QI.rARTERLY <br />QUARTERLY <br />SGLFATE <br />RLUMINUhf <br />ARSENIC <br />CADMIUM <br />IRON <br />LEAD <br />hfANGANESE <br />MERCURY <br />MOL S'BDENUM <br />SELENIUh1 <br />ZINC <br />7. DURING ANY PERIOD tJHEN THE 2 JUNIOR FJA TER RIGN. TS (ZIJTALING 6 cfs) HELD <br />BY MEL MARTI.NEZ ARE UNDER CALL BY THE 2 SENIOR WATER RIGHTS DOWNSTREAhf <br />FROM THE MINING OPERATION, AND DURING A TOTAL CALL ON ALL GJA TER RIGHTS <br />HELD BY' MEL h1ARTINE2, THE CHIFINEY ROCK COAL COMPANY AND ANY SUCCEEDING <br />OPERATORS S.YALL lJITHDRA[J VO WATER TRIBUTARY TO S417LLSTEIMER CREEX FOR <br />CONSUh1PT2VE USE. WITHDRAWAL OF WATER SHALL INCLUDE BOTH GROUND RND <br />SURFACE WATx-'RS TRIBUTARY TO STOLLSTEIMER CREEX. CONSUhfPTIVE USE SHALL <br />INCLUDE ALL WATER USED BY THE MINING OPERATION FOR DOd1ESTIC USE, DUST <br />SUPPRESSION, AND WASHLt7WN OF EQUIPMENT, OR CONSUh1ED THROUGH EVAPORATIVE <br />LOSS FROM PONDS, IMPOUNDhJENTS, AND/OR PIT SUMPS. <br />8. THE FERMITTEE SHALL SUB:+!IT 7'O T.YE DIVISION A WRITTEN DEh10NSTRATION THAT <br />SUFFICIENT ADJACEIJT COMPARABLE PIt7Y0l1-JUNIPER COh1h1UNIT1' EXISTS TO SAbfPLE <br />IN T.YE 2993 GROfJI.VG SEASON FOR HERBACEOUS PRODUCTION. THIS DE.^]ONSTRATION <br />SRALL INCLUDE, AT A MINIMUM, A DISCUSSION OF THE PERhf1TTEE'S CONTROL OVER <br />AGRICULTURAL AND/OR GRAZING PRACTICES IN TXE AREA, A DISCUSSIOfJ OF ABIOTIC <br />FACTORS (INCLUDItJG BUT NOT LIt•1IETED TO SLOPE, ASPECT, ELEVATION, SOIL TYPE) <br />WHICH INr^LUENCE SLNILARITY '117 THE AREA Tt7 BE DISTURBED AND THE PINYON-JUNIr^ER <br />REFERENCE AREA, AND A DISL'CSSION OF ;BIOTIC FACYYJRS WHICH h1AY AFFECT THE <br />SLVILARiTY OF THE AREA TO THE AREA TO BE DISTURBED AND REFERENCE AREA. <br />THIS WRITTEtl DEd10NST4.9TION SRALL BE APPROVED BY THE DIVISION IN WRITING <br />PRIOR '1D DISTURBANCE OF THE BARREN RIDGE AREA. <br />