My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35136
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:16 PM
Creation date
11/23/2007 8:11:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
General Documents
Doc Date
10/12/1982
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
From
Old Name Martinez Strip Mine
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br />List of Stipulations <br />1. A REVISED EXHIBIT 27', DESCRIBING THE MANAGEMENT PLANS TO BE IMPLEMENTED <br />FOR A DRYLA7dD PASTURE MUST BE SUBMITTED FOR DIVISION APPROVAL I4ITHIN 90 <br />DAYS OF PERMIT ISSUANCE. <br />2. THE GROUND [~7ATER h..*ONI2t~RING PROGRAM WILL INCLUDE THE FOLLOWING MONITORING <br />FREQUENCY' AND ALL [J.$TER ANALYSES WILL BE PERFORCQED USING THE PARAMETERS LISTED <br />BELOW: <br />WELL [JA TER LEVEL WATER SAMPLING <br />DESIGIJATZON CHECK FREQUENTY FREQUENCY <br />G9l MONTHLY QUARTERLY <br />WS MONTHLY QUARTERLY <br />W6 MONTHLY QUARTERLY <br />[/6c ~NONTHLY QUARTERLY <br />W9 PfONTHLY QUARTERLY <br />P710 MONTHLI' QUARTERLY <br />REQUIRED PARAMETERS <br />pH (FIELD) CALCIUdI SULFATE LEAD <br />CONDUCTIVITY AT 25 c (FIELD) MAGNESIU,Rf ALUMINUM MANGANESE <br />TFi~1PERATURE (FIELD) AMMONIA ARSENIC C9ERCURY <br />TOTAL DISSOLVED SOLIDS NITRATE CRANIUM SELENIUM <br />BICARBONATE SODIUM IRON ZINC <br />3. THE APPLICANT SHALL INSTALL A MONITORING [SELL IN THE SOUTHWESTERN PORTION <br />OF THE BACKFILLED PIT. THE WELL SHALL BE INSTALLED IN THE~LOWEST PORTION <br />OF THE PIS IN ORDER ~ MONITOR THE SPOIL AQUIFER. MONITORING PARAMETERS <br />SHALL INCLUDE; MONTHLY WATER LEG'ELS, AS WELL AS THE FOLLOWING FIELD <br />PARAMETERS, pf1, ELECTRO-CONDUCTIVITY, TEhIP£RATURE, AND QUARTERLY [9ATER <br />CHEMISTRY. <br />4. THE APPLICANT SHALL CONDUCT A MINIMUbt OF THREE ICJFILTRATION TESTS OVER THE <br />EXISTING RECLAIMED SPOILS. RESULTS OF TFIESE TESTS PLUS AN ESTICfATED <br />RECHARGE RATE FOR THE RECLAIMED SPOILS SHALL BE SUBMITTED TO THE DIVISION <br />[•IITHIN 6 i~fONTHS OF THE PERMIT ISSUANCE, <br />5. THE APPLICANT SHALL CONDUCT A MINIM. UM O£ THREE 6U DAY STAGNANT LEACH TESTS <br />OF THE SPOILS PLACED IN THE SATURATED ZONE OF THE BACKFILLED PIT. THE <br />WATER SAFfPLES OBTAIClED FROM TXE LEACH TEST SHALL BE ANALYZED FOR THE <br />PARAMETERS LISTED IN STIPULATION 2. THE DATA FROdf LEACH TESTS AND A <br />PROJECTION OF THE SPOIL HATER QUALITY SHALL BE SUBM1JITTED TO THE DIVISION <br />IJI TXIN 3 AfONTXS OF PERIfIT ISSUANCE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.