Laserfiche WebLink
-15- <br />Stipulation <br />2. THE GROUND WATER MOfJITORZNG PROGRAhf LdILL INCLUDE THE FOLLOWING MONITORING <br />FREQUENCY RND ALL WATER ANALYSES k'ILL BE PERf17RAtED USING TXE PARNfETERS LISTED <br />BELOW: <br />WELL WATER LEVEL WATER SAMPLING <br />DESIGIJATION CffECK FREQUENCY FREQUENCY <br /> <br />WI hfONTHLY QUARTERLY <br />tJ5 MONTHLY QUARTERLY <br />W6 MONTHLY QUARTERLY <br />W6c h10NTXLY QUARTERLY <br />W9 MONTHLY QUARTERLY <br />W10 MONTHLY QUARTERLY <br />REQUIRED PARAMETERS <br />pH (FIELD) CALCIUhf SULFATE LEAD <br />CONDUCTIVITY AT 25oc (FIELD) MAGNESIUM ALUMZNUhf MANGANESE <br />TEMPERATURE (FIELD) RM.MONIA ARSENIC MERCURY <br />TOTAL DISSOLVED SOLIDS NITRATE CADMIUI.1 SELENIUhI <br />BICARBONATE SODIUM IRON ZINC <br />Chimney Rock Coal must submit the results of the above monitoring program to the <br />Division semi-annually. <br />The present mining operation is currently impacting the quantity of ground <br />water in Stollsteimer Creek. Further the operation will impact the quality of <br />both ground and surface water in the future. To assess these impacts, the <br />follo~oing stipulations are required: <br />Stipulation <br />3. THE APPLICANT SHALL INSTALL A MONI~R LNG WELL IN THE SOUTHWESTERN PORTION <br />OF THE BACKFILLED PIT. TXE WELL SHALL BE INSTALLED IN THE LOF.'EST PORTION <br />OF TXE PIT IN ORDER ~ ~"•1ONITOR TXE SPOIL AQUIFER. M0172T0RINC PARAMETERS <br />SHALL INCLUDE; MOLJTffLl' WATER LEVELS, AS WELL AS THE FOLLOWING FIELD <br />PARAMETERS, pH, ELECTRO-CONDUCTIVITY, TEMPERATURE, .AND QUARTERLY WATER <br />CHEMISTRY. <br />Results of the monitoring must be submitted to the Division semi-annually. <br />S ti put a ti on <br />4. THE APPLICA VT SHALL CONDUCT A MINLMUhf OF THREE INFILTRATION TESTS OVER THE <br />EXISTIflG RECLAIMED SPOILS. RESULTS OF THESE TESTS PLUS AN ESTIMATED <br />RECHARGE RATE FOR TXE RECLAIMED SPOILS SHALL BE SUBMITTED TO THE DIVISION <br />WITHIN o` MONTHS OF THE PERMIT ISSUANCE. <br />Sti pU13 tiOn <br />5. TXE APPLICANT SHALL CONDUCT A .MINIh1UM OF THREE 60 DAY STAGNAIJT LEACH TESTS <br />OF THE SPOILS PLACED IN THE SATURATED ZONE OF THE BACKF ILLED PIT. TXE <br />WATER SAMPLES OBTP.INED FROhf THE LEACH TEST SHALL BE ANALYZED FOR THE <br />PARAhfETF1ZS LISTED IN STIPULATION Z. THE DATA FROM LEACH TESTS .i IJD A <br />PROJECTION OF THE SPOIL t:'A TER QUALITY SHALL BE SUBMITTED TO TXE DIVISION <br />A'ITHSN 3 MOlJTHS O£ PERMIT ISSL'A NCE. <br />