My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35092
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:14 PM
Creation date
11/23/2007 8:10:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
General Documents
Doc Date
7/2/1997
Doc Name
DOCUMENTED QUOTE GRASSY GAP MAINTENANCE PROJECT PKA-8-1036
From
DMG
To
INTERESTED CONTRACTORS
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT R'ORK DESCRIPTION <br />ITEM 1 MOBILIZATION and DEMOBILIZATION <br />[. Mobilization <br />This task includes moving equipment and supplies to the project area. If desired, the <br />CONTRACTOR may establish a staging area for the storage of all equipment and supplies. <br />The area shall be of adequate size to accommodate all of the CONTRACTORS vehicles, <br />equipment, and supplies and shall be approved by the PROJECT MANAGER. The <br />CONTRACTOR shall minimize impact on the staging area with regard to noise, dust, and <br />fumes. The CONTRACTOR shall be responsible for maintaining security of the staging azea. <br />This task also includes all labor and costs associated with locating and protecting utilities, <br />both above ground and underground, at the work site. <br />The CONTRACTOR shall exercise caution during mobilization, performance of all work <br />tasks, and demobilization in order to avoid damage to public and private property including, <br />but not limited to, pavements, soils, vegetation, water supplies, fences, walls, structures, <br />existing sediment ponds, landscaping etc. The CONTRACTOR shall repair and restore public <br />or private property damaged during the work at his expense. See also Section 1.0 of the <br />"Standazd Work Specifications" included in CDMG General Bid Specifications, 1996. <br />II. Demobilization <br />This item shall include all labor, equipment, and costs associated with demobilization and <br />clean-up of the work site to its original or better condition. All equipment and supplies, <br />materials, and debris related to this project will be removed from the site upon completion. <br />The CONTRACTOR shall also reclaim any staging area or other ground disturbed during the <br />course of the project located outside of the project area as defined by this Bid Document. All <br />haul roads shall be fully regraded and reclaimed upon completion of the project. Additional <br />final grading shall be accomplished to reduce oversleep slopes, if needed. <br />The CONTRACTOR shall be fully responsible for any and all damage to property caused by <br />his equipment or personnel. The CONTRACTOR shall ensure that the job site is restored to <br />original or better condition and that the PROJECT MANAGER accept that the work is <br />complete. See also Section 1.0 of the "Standard Work Specifications" included in CDMG <br />General Bid Specifications, 1996. <br />Measurement and Payment <br />No measurement for payment shall be made for mobilization and demobilization. Alump <br />sum bid for mobilization and demobilization shall be reflected under Item 1 of the Bid <br />Schedule. Payment of two-thirds of the lump sum price will be made with the first montlily <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.