Laserfiche WebLink
<br /> <br />Colorado Division o` 14ine rats and Geo Logy <br />ESTIMATING F02M - EQUIPMENT M09ELIZAT ICN / DEMOBILIZATION <br />sheet 1 of 2 <br />Task p .. 9 Prep. by ESC Filena me..f4191-9 <br />Daze..... O1-Sep-98 Permit q M-]]-191 Mine ....Lyons Qua cry <br />Pe rmrc Action........ Reeva luace amount of required bond ' <br />Task Descriptron..... Mobilization/Demobilicacion <br />HOURLY EQUIPMEPrC COST <br />Mob/Demob Eqp. -Tractor <br />-LC. Trailer <br />-Med. Trailer <br />-Hr/. Trailer <br />-Pilot Car <br />. -Hyd. Crane <br />-Fuel Truck <br />-Cube Truck <br />-Flatbed Truck <br />NOTE - Th rs rs a list co select Erom, not a list of mandatory r[ems to include. <br />6x4, ]5.000 lb GvW, 3]E HP, tltesel powered <br />25 ton folding gooseneck, drop deck <br />50 ton folding goose necM., drop deck <br />120 Ton folding gooseneck, drop deck <br />On-highway lig he duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline pave red <br />Grove RT66E rough terrain hytlraulic crane, 20 Con capacity, 125 hp, 70 ft. boon <br />6x4, 3,600 gallon capacity. 210 HP, diesel powered <br />6x9, 2,500 gallon capacity, 210 HP, diesel powered <br />J0. 000 lb GVW, 210 HP, diesel powered <br />Last Update: """"'"""'"""""----- - -- <br />August, 199] (cracks) <br />"""""""--"--'-------- Lt. Rig Med.Rig Hvy.Rig <br />Cost Breakdown: <=29 T. 26-60 T. > 50 T. <br />Owr.e rship Cost/hr = $25 .59 528. 30 531 .]8 <br />Operating Cost/hr 528 .38 530. 1'] 532 .34 <br />Operator Cost/hr = $22 .61 $22. 61 522 .61 <br />Helper Cosc/hr • 521 .82 $21. 82 521 .82 <br />Total $98.40 5102.]0 $108.15 <br />NON-ROADABLE EQUIPMENT <br />______________________ <br />Machine Description <br />CAT D9N Dozer <br />CAT 631E Sc ra pet <br />Revegetation Equipment <br />Weight Ownership <br />Icons) Cosc/hr <br />52.40 546.08 <br />33.60 $45.]8 <br />20.00 $60.00 <br />Pilot Hydraulic Fuel Lube <br />Car Crane Truck Truck <br />$1.73 $24.12 $6.88 $12.66 <br />59.82 $11.98 $19.5] $25.56 <br />521.82 $23.13 $22.35 521.29 <br />50.00 $0.00 $0.00 50.00 <br />$28.3] <br />"__"___ 5]8.'13 <br />_______ $98.80 <br />_"_____ $59.46 <br />______" <br />Haul Rig Fleet Size Haul Trip Return Trip <br />Cost/hr Ino. hauletl) Cost/hr Cost/hr <br />$108.15 2 $308.46 5216.30 <br />$102.]0 2 $296.96 5205.40 <br />$98.90 1 $158.40 $98.40 <br />Flatbed <br />Truck <br />$].56 <br />$11.82 <br />522.35 <br />$D.aa <br />592.05 <br />DOT Permrt <br />Cosc/ea <br />$o.oo <br />$0.00 <br />50.00 <br />Subtotals $]63.82 $520 10 50.00 <br />