Laserfiche WebLink
<br />Bob Liddle <br />-2- February 3, 1983 <br />There are several specific aspects of the conceptual plans for Pleases I1 <br />and III which I believe will require significant effort to resolve. The <br />applicant proposes a subdrain to accommodate the surface flow of the <br />ephemeral channel separating the East and West Ridges. This subdrain <br />will require considerable geotechnical and hydrogeological justification <br />and specific final engineered design. In addition, stability analyses <br />for Phases II and III will be required prior to approval of either of <br />these facilities in later permits. <br />Your approval document should clearly specify that we are only approving <br />Phase I. <br />/ant <br />cc: Ed Bischoff <br />Doc. No. 675 <br />