My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34912
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:09 PM
Creation date
11/23/2007 8:06:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
3/20/1990
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix II <br />STIPULATION STATUS: BEAR MINES 1, 2, AND 3 <br />Stipulation No. 1: <br />PRIOR TO SEDIMENT POND CONSTRUCTION, THE PERMITTEE WILL SUBMIT TO THE <br />DIVISION REVISED POND DESIGNS WHICH WILL INSURE THAT RUNOFF STORAGE <br />CAPACITY WILL NOT BE REDUCED BY GROUND WATER DRAINING INTO THE POND AT <br />ANY TIME DURING THE YEAR. FURTHERMORE, THE PLAN WILL INCLUDE A <br />PROPOSAL FOR LINING THE POND, OR OTHERWISE PREVENTING THE <br />CONTAMINATION OF NEAR SURFACE GROUND WATER AS A RESULT OF PERCOLATION <br />THROUGH THE ALLUVIUM. <br />Status: Terminated. <br />Stipulation No. 2: <br />WITHIN ONE MONTH OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT TO THE <br />DIVISION A REVISED PLAN FOR HANDLING POSSIBLE FLOODING OF PORTIONS OF <br />THE PERMIT AREA. THE PLAN WILL INCLUDE AN EVALUATION OF ALTERNATIVE <br />FLOOD CONTROL TECHNIQUES AND POTENTIAL DOWNSTREAM EFFECTS OF ANY FLOOD <br />DIVERSIONS. EFFECTS OF THE RIVER CHANNEL RELOCATION ON FLOODING IN <br />THE AREA WILL BE INCLUDED IN THE EVALUATION. <br />Status: Terminated. <br />Stipulation No. 3: <br />WITHIN 1 MONTH OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT TO THE <br />DIVISION A DETAILED PLAN FOR HANDLING AND TREATING ANY DISCHARGE OF <br />WATER FROM THE UNDERGROUND WORKINGS WHICH DOES NOT MEET THE EFFLUENT <br />LIMITATIONS OF 4.05.2. THE PLAN WILL ADDRESS THE MEASURES 70 BE USED <br />TO PREVENT OR CONTROL GRAVITY DISCHARGE INCLUDING CONVEYANCE T0, <br />MAINTENANCE OF, AND DISCHARGE FROM SUMPS, SEDIMENTATION PONDS OR A <br />TREATMENT FACILITY ON THE PERMIT AREA. <br />Status: Terminated. <br />Stipulation No. 4 <br />THE APPLICANT SHALL CONTINUE TO SUBMIT TO THE DIVISION AN ANNUAL <br />REPORT OF INFLOWS, DISCHARGES AND CONSUMPTION OF WATER WITHIN THE <br />MINE. THIS REPORT IS TO INCLUDE A WORKIIGS MAP WHICH SHALL CONTAIN <br />THE SOURCE (I.E., FAULT, FRACTURES, ETC.) QUANTITY, DURATION, AND <br />QUALITY (CONTAINING RECORDS OF WATER DISCHARGES AND TEMPERATURE) OF <br />ALL INFLOWS; A TABLE CONTAINING RECORDS OF WATER DISCHARGED FROM THE <br />MINE, CONSUMED IN THE MINE AND IMPORTED FOR USE WITHIN THE MINE. <br />Status: Active. <br />-17- <br />
The URL can be used to link to this page
Your browser does not support the video tag.