Laserfiche WebLink
Technical Revision Reduction in alluvial well monitoring <br /> (from 3 to 2 wells) <br /> Submitted: May 30, T985. <br /> Approved, November 8, 1985. <br />Technical Revision Midterm 181e: 1. The extension of the eastern <br /> permit boundary to include areas within the angle <br /> of draw of subsidence. <br /> 2. The adjustment of the performance bond <br /> requirement to reflect current reclamation costs. <br /> 3. The removal of Lone Pine Gulch from surface <br /> water monitoring. <br /> 4. The reduction in the number of transects for <br /> vegetation sampling at the Bear No. 1 and No. 2 <br /> mines. <br /> 5. The reorganization of the Bear Coal Company <br /> permit application to include past revisions as <br /> exhibits and the inclusion into the permit <br /> application of a permit cross-reference guide. <br /> Submittal date: January 3, 1986. <br /> Approved, March 5, 1986. <br />Technical Revision Landslide repair: Portal bench widening for fan. <br /> Submittal date: July 20, 1986. <br /> Decision and date: <br />Technical Revision No. 3 B seam Mine Plan. <br /> Submitted: November 21, 1988. <br /> Approved with condition, March 13, 1989. <br /> Condition: Stipulation 25 <br />Technical Revision No. 4 Permanent Waste Pile <br /> Submitted: January 20, 1989. <br /> Incomplete, February 7, 1989. <br />Technical Revision No. 5 Retreat mining in the B seam. <br /> Submitted: September 22, 1989. <br /> Approved, November 7, 1989. <br />PERMIT REVISIONS: <br />Permii Revision Mining of Federal Lease C-0117192, increase in <br />permit area. <br />Submittal date: June 13, 1985. <br />Decision and date: <br />-16- <br />