Laserfiche WebLink
2. PUMPAGE RATES FROM 7HE MINE TO THE SEDIMENT PONDS WILL BE RECORDED <br />WITH THE MINE WATER TESTED QUARTERLY FOR FIELD PARAMETERS AND ONCE <br />YEARLY FOR THE FULL SUITE OF CHEMICAL PARAMETERS. <br />3. THE GEOTECH WELL, LOCATED AT THE PROJECTED BASE OF THE REFUSE PILE <br />AND COMPLETED IN THE ALLUVIUM, WILL BE SAMPLED MONTHLY FOR WATER LEVEL <br />AND FIELD PARAMETERS AND QUARTERLY FOR FULL SUITE CHEMICAL PARAMETERS. <br />FIELD PARAMETERS <br />FULL SUITE CHEMICAL PARAMETER <br />TEMPERATURE pH MAGNESIUM <br />pH TEMPERATURE SULFATE <br />CONDUCTIVITY SPECIFIC CONDUCTANCE FLUORIDE <br />FLOW OR WATER LEVEL DISSOLVED SOLIDS BORON <br /> SODIUM ALKALINITY <br /> POTASSIUM BICARBONATE <br /> CALCIUM <br />The requirements of original Stipulation No. 1 have been modified by <br />Technical Revisions 03 (in April, 1988) and 04 fin June, 1988). <br />STIPULATION N0. 3 <br />SEDIMENT POND SP-1 AND SP-2 WILL BE MAINTAINED WITH SEDIMENT AT OR <br />BELOW THE 60 PERCENT LEVEL. <br />-3- <br />