Laserfiche WebLink
XYI, Explosives - Rules 2.05.3(6) and 4.08 <br />According to the operations plan, blasting will not occur on a regular basis. <br />Occasional use of explosives during facilities construction was approved in <br />Minor Revision 1 in June, 1985. <br />The operation is in compliance with the requirements of this section. <br />XYII. Backfilling and Gradino - Rules 2.05.3(9), 2.05.4(2)(c), 4.09 and 4,14 <br />On April 3, 1985, Eastside submitted an analytical demonstration of the slope <br />stability of the proposed post-mining topography at the mine site, in response <br />to Stipulation No. 8. Division approval was granted in a letter to the <br />permittee dated May 9, 1965. <br />In the same April 3, 1985 correspondence, the permittee responded to <br />Stipulation No. 9 by replacing the pipe drain design for outfall of refuse <br />pile drainage with a design fora gravel drain, This response was accepted by <br />the Division in the same May 9, 1985 letter to Eastside Coal Company. <br />The operation is in compliance with the requirements of this section, <br />XVIII. Mine Facilities, Coal Handling Structures, Support Facilities - Rules <br />The discussion in this section of the original Findings Document remains <br />valid, The only chance in this section involves approval of the loadout <br />facility in Rifle, Colorado (Technical Revision 2). Construction of many of <br />the facilities (loadout, conveyor and screening facility, planned office area, <br />and refuse pile) has been delayed due to mine inactivity. <br />The operation is in compliance with the requirements of this section. <br />XIX. Underground Development Waste, Coal Processina_ Waste, and Non-Coal <br />Processina aste - Ru es an 4,11 <br />Stipulation No. 10 required Eastside Coal Company to submit a plan for storage <br />and disposal of non-coal waste. Revised pane 108 of the permit application <br />states that such wastes will be disposed of in county dumps. Stipulation <br />No. 10 is therefore satisfied, This section of the original Findings Document <br />is otherwise still valid. <br />The operation is in compliance with the requirements of this section. <br />XX. Roads - Rules 2.05.4(3) and 4,03 <br />No chances are required. The operation is in compliance with the requirements <br />of this section. <br />-10- <br />