Laserfiche WebLink
2. Placement of demolished structures at the base of fill areas. <br />The PROJECT MANAGER shall be notified by the CONTRACTOR immediately upon <br />completion of placing demolished structures and/or other mining related <br />material along the ease of areas to be backfilled and before any fill <br />material is placed over the demolished material. Placement of any earth <br />fill material in these areas shall not occur until the PROJECT MANAGER <br />has inspected the placement operation and verified to the CONTRACTOR that <br />placement work has been done in accordance with the specifications. <br />TDG/yjb <br />030 5F <br />-2rr <br />