My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34766
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:04 PM
Creation date
11/23/2007 8:02:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
10/26/1989
Doc Name
INVITATION AND BID-West Mine reclamation
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.3 Execution <br />Operators <br />The equipment shall be furnished complete with competent operating <br />personnel. Operators shall be qualified to cerform all work under this <br />specification in a skillful and workmanlike manner. The OWNER ma.y, in <br />writing, require the CONTRACTOR to remove from the work any employee the <br />OWNER deems incompetent or careless. <br />Supervision <br />The CONTRACTOR shall be responsible for the supervision of all mechanical <br />operations of the equipment including proper maintenance. <br />Equipment maintenance, fueling and repairs shall be done so spillage of <br />lubricants and fuel is minimized. <br />Performance of Work <br />Supplemental work shall be performed after the general construction work <br />in that particular area has been accomplished and shall consist of <br />general earthmoving or other finishing work as may be directed by the <br />PROJECT MANAGER. <br />All operations under this section will be under the direct supervision of <br />the PROJECT MANAGER and work under this section shall be performed only <br />as ordered and directed by the PROJECT MANAGER. The PROJECT MANAGER will <br />designate the work to be performed and the order in which it is to be <br />done, and WILL inspect all work. The PROJECT MANAGER will maintain <br />documentation of the work. <br />Equipment Rental Documentation <br />a. The PROJECT MANAGER will maintain a job diary to record daily <br />activities, progress and accomplishments. <br />b. At the close of each day's operations during which equipment rental <br />work has been directed to be done by the PROJECT MANAGER under this <br />scecification, the PROJECT MANAGER shall prepare, in duplicate, a <br />form entitled "Equipment Rental Record" listing the date, times and <br />total hours (computed to the nearest one-half hour), each piece of <br />equipment was operated in accordance with this specification. <br />"Operation" means that time spent in performing work as well as time <br />necessary for moving equipment around the work site when directed by <br />the PROJECT MANAGER. However, "operation" does not include that <br />time spent in transporting the equipment to the initial work site, <br />removing the equipment when all work had been completed, <br />transporting the equipment away from and returning it to the work <br />site in the event of a temporary or seasonal suspension of <br />operation, maintenance of the equipment, any time during which the <br />equipment is "bogged down" or otherwise non-productive, nor for any <br />periods during which operations are suspended by the OWNER. <br />-23- <br />
The URL can be used to link to this page
Your browser does not support the video tag.