Laserfiche WebLink
II. PROJECT WORK DESCRIPTION <br />Project Summary <br />The Hawk's Nest mine site has been ordered to be reclaimed by the Colorado <br />Department of Natural Resources, Mined Land Reclamation Board (the Board). <br />The operator of the mine failed to comply with regulatory requirements for an <br />extended period of time, resulting in revocation of the mining permit and <br />forfeiture of the reclamation performance bond being held b.y the Mined Land <br />Reclamation Division (the Division). The Board has directed the Coal <br />Regulatory Section of the Division to secure reclamation of the site using <br />funds obtained from the forfeited cerformance bond. <br />The Hawk's Nest mining operation is comprised of 4 separate disturbed areas: <br />1) East mine area; 2) West mine area; 3) Silo area; and 4) Refuse disposal <br />area. Reclamation work to be accomplished under this contract is limited <br />primarily to the west mine area. Project work will involve backfilling 6 mine <br />openings, removing and disposing of 19 mining related structures and <br />facilities, removing and disposing of all above around electrical utilities, <br />general site clean uD, regrading and ripping disturbed areas, and <br />reconstructing drainage control structures. A portion of the electrical <br />utility removal work will extend from the west mine area to both the silo area <br />and east mine area. <br />Adequate rights-of-way needed for access to the project area and within the <br />working area limits specified for this project have been acquired by or on <br />behalf of the OWNER. <br />The west mine and silo areas are located within the S1/2 of Section 10, T13S, <br />R90W; the east mine area is within the S1/2 of Section 11, T13S, R90W. The <br />refuse disposal area is located within Section 28, T14S, R92W, 6th P.M. <br />III. PROJECT WORK SPECIFICATIONS <br />1.0 MOBILIZATION/DEMOBILIZATION <br />1.1 Description <br />This specification covers the CONTRACTOR'S operations for: <br />Payment of premiums for bonds and insurance acquired specifically <br />for the construction of this project, including premiums for <br />performance and payment bonds; <br />b. Movement of personnel, equipment, operation supplies, and <br />incidentals to the project site, but not within the work limit area; <br />d. Preparatory work at the construction site; <br />e. Demobilization of CONTRACTOR'S equipment and all other facilities, <br />final project clean-up, and for all other work for which oa.yment is <br />not otherwise provided for under the contract. <br />- 3- <br />