Laserfiche WebLink
State Stipulation <br />and was satisfied <br />1988)• <br />7 required the applicant to stabilize steeper slopes <br />(see State's Findings of Compliance dated FQbruary . <br />Western Field Operations <br />Office of Surface ,Sining Reclamation and Enforcement <br />State Stipuletion 8 required a plan for use of herbicides and pesticides <br />and is carried forward in the State permit as Stipulation tlo. 8. <br />State Stipulation 9 required notification of State wildlife personnel <br />prior to arty blasting and is carried forward in the State permit as <br />Stipulation No. 9. <br />State Stipulation 10 required annual verification of overburden swell <br />factors and is carried forward in the State permit as Stipulation No. 10. <br />State Stipulation 11 required Colorado MLRD approval of light use roads <br />prior to construction and is carried forward in the State permit as <br />Stipulation No. 11. <br />State Stipulation 12 required revision of the reclamation plan and was <br />satisfied (see State's Findings of Compliance dated February 1988). <br />The standard and special conditions of the existing mining plan approval <br />are appended to this memorandum as Attachment A. There are two <br />remaining special conditions of approval of the mining plan. <br />III. Approval: <br />I approve the termination of Federal permit CO-0030, issued on January 24, <br />1984, for the Chimney Rock Cosl mine. The applicable standard and special <br />conditions of the mining plan approve3 by the Assistant Secretary on Januerf <br />23, 1984, are appended as Attachment A and remain in full force and effect <br />notwithstending this permit termination approval. <br />/ i~ ~ <br />Chief, Fed r 1 Programs ivision Dat <br />