Laserfiche WebLink
. ~~~ <br />Colorado Mined Land Reclamation <br />November 12, 1985 <br />Page Two <br />Even though the 1985 production would have restarted the <br />reclamation time clock, it was felt that Ideal z.nd the <br />County could arrive at a Letter of Intent agreement in <br />the near future, so reclamation of the north 900 feet was <br />left on the original schedule. However, ~:omplex <br />questions have arisen regarding future liability under <br />the law, and volume scheduling, which will require more <br />time for resolution. Therefore, Ideal is hereby <br />requesting that permission be granted by MLR to postpone <br />the reclamation of the north 900 feet of the Boettcher <br />Limestone Quarry until 1988. <br />Sincerely, <br />P. E. Thomsen <br />Sr. Mining Engineer <br />PET:jep <br />