My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34598
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34598
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:59 PM
Creation date
11/23/2007 7:59:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
General Documents
Doc Date
11/15/2006
Doc Name
Proposed Decision & Findings of Compliance for SL2
From
Phase I 35.14 acres
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Raw coal conveyor #2 $3,236.00 MR-68 <br />Train unloading hopper $7,766.00 MR-84 <br />Raw coal conveyor #3 $8,413.60 MR-84 <br />Raw coal conveyor #4 $7,766.40 MR-84 <br />Rail unloading substn $2,100.48 MR-84 includes "remove transformer" <br />Stacking tubes $1654.10 MR-84 <br />Refuse belt extension $19,416.00 TR-38 <br />Refuse belt extension $22,652.00 TR38 Listed as "grasshopper conveyor" <br />Culvert C-57 $916.75 TR-38 <br />Culvert C-58 $130.53 TR-38 <br />Extra CMP removal $380.48 Listed as "RDA belt extension CMP removal" <br />Direct Cost Total $113,267.22 Division calculation for bond reduction <br />Partial Phase I release for structure removal <br />Many of the structures removed are located on areas where backfilling and grading <br />activities have also been completed. The demolition costs associated with areas <br />successfully backfilled and graded are eligible for Phase I bond release. However, <br />Picketwire Processing also requested a partial Phase I bond release where structures <br />were removed but were located in areas where backfilling and grading have not been <br />completed. The demolition cost for these structures are not eligible for bond release <br />until such time that all required Phase I activities, including backfilling, grading, and <br />drainage control, have been completed. The Division cannot approve a partial Phase <br />bond release for structure demolition where backfilling and grading has not been <br />completed in accordance with the approved reclamation plan. These structures are <br />listed in the table below. <br />Descri tion Re nested Amount Comments <br />East Portal Hoist House $ 12,952.31 B and G not com lete <br />Unit Train Loadout $ 22,498.18 B and G not com lete <br />Total $ 35,450.49 Not ell ible for bond release <br />Reclamation Costs associated for Phase I work completed <br />The Division calculated the bond amount associated with the Phase I work completed <br />under the bond release application as submitted and modified. Direct and indirect costs <br />for these activities results in a dollar amount of bond to release of $286,352.00 (line <br />item #3 in Table B). The detailed cost estimate for work performed is also included in <br />Appendix A, Part 3 of Exhibit 28 of the approved permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.