Laserfiche WebLink
-3- <br />TOTAL DISSOLVED SOLIDS NITRATE-NITRITE <br />TOTAL SUSPENDED SOLIDS PHOSPHATE <br />OIL AND GREASE ALUMINUM <br />SODIUM ADSORPTION RATIO ARSENIC <br />CALCIUM BARIUM <br />POTASSIUM COPPER <br />SODIUM IRON <br />BICARBONATE LEAD <br />CARBONATE MANGANESE <br />CHLORIDE MERCURY <br />SULFATE MOLYBDENUM <br />AMMONIUM SELENIUM <br />FLUORIDE ZINC <br />ALL SAMPLES SHALL BE COLLECTED, PRESERVED, AND ANHLYZED <br />ACCORDING TO U.S. E.P.A. METHODS. <br />ALL RESULTS AND DATA COLLECTED FUR THE MONITORING PROGRAM SHALL <br />BE SUBMITTED TU THE DIVISION ON A QUARTERLY BASIS, BEGINNING ON <br />THE 4th MUIVTH AFTER PERMIT ISSUANCE. <br />Stipulation No. 2 <br />WITHIN 60 DAYS OF CONSTRUCTION OF A SEDIMENT POND, THE OPERATOR <br />SHALL 1) SUBMIT CERTIFIED AS-BUILT DESIGNS FOR THE PONDS SHOWING <br />DIMENSIONS AND ELEVATIONS AND 2) SUBMIT A REPORT CERTIFIED BY A <br />QUALIFIED REGISTERED PROFESSIONAL ENGINEER THAT STATES THAT THE <br />POND WAS CONSTRUCTED ACCORDING TO THE APPROVED PLAN CONTAINED IN <br />THE APPLICATION. <br />Stipulation No. 3 <br />WITHIN d0 DAYS OF <br />REPORT CERTIFIED <br />THAT STATES THAT <br />ACCORDING TO THE <br />REVISION. <br />Stipulation No. 4 <br />PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT A <br />BY A QUALIFIED REGISTERED PROFESSIONAL ENGINEER <br />THE EXISTING SEDIMENT POND WAS CONSTRUCTED <br />APPROVED PLAN INCLUDED IN THE AUGUST 10, 1982 <br />THE PERMITTEE SHALL SUBMIT TU THE DIVISION, FUR APPROVAL, A <br />DETAILED GROUND WATER MONITORING PLAN. THIS PLAN SHALL BE <br />SUBMITTED WITHIN 30 DAYS OF THE ISSUANCE OF THIS PERMIT <br />DOCUMENT. THIS PLAN SHALL INCLUDE: 1) A MAP SHOWING THE <br />LOCATION OF ALL GROUND WATER WELLS TO BE MONITORED, 2) A TABLE <br />WHICH OUTLINES THE FREQUENCY OF MONITORING, AND 3) A LIST OF <br />PARAMETERS TO BE MONITORED. <br />ONCE A PLAN HAS BEEN APPROVED, MONITORING SHALL COMMENCE IN <br />ACCORDANCE WITH THE PLAN AND MONITORING DNTA WILL BE SUBMITTEU <br />TO THE DIVISION QUARTERLY. <br />