Laserfiche WebLink
-17- <br />VI. Hvdroloaic Balance: Ground Water - Rul <br />The ground water sections of the permit application can be found in <br />Volume I, pages `1.04-31 through 2.04-44. Additional yround water <br />information was submitted in the Responses to the Preliminary Adequacy <br />Review dated November 11, 1981 and in responses dated September 30, <br />1982. A map of the flooded underground mine workings was submitted on <br />December 14, 1982. <br />The applicant has installed numerous ground water monitoring wells and <br />has developed a sufficient pattern of wells to adequately monitor ground <br />water. The applicant has also committed to ..monthly measurement of <br />ground water levels and quarterly collection of water quality samples" on <br />pages 4.05-1U and 4.05-11 of the application. <br />However, the applicant has not specified which monitoring wells will be <br />monitored, and the parameters to be monitored at each well. The <br />following stipulation requires that a more detailed ground water <br />monitoring plan be submitted and approved by the Division, in order to <br />find the applicant in compliance with Rule 4.05.13(1). <br />Stipulation No. 4 <br />THE PERMITTEE SHALL SUBMIT TU THE DIVISION, FOk APPROVAL, A <br />DETAILED GRUUNU WATER MONITORING PLAN. THIS PLAN SHALL BE <br />SUBMITTEU WITHIN 30 OAYS OF THE ISSUANCE OF THIS PERMIT <br />DOCUMENT. THIS PLAN SHALL INCLUDE: 1) A MAP SHOWING THE <br />LOCATION OF HLL GROUNU WATER WELLS TU BE MOIVITURED, 2) A TABLE <br />WHICH OUTLINES THE FREQUENCY OF MONITORING, ANO 3) A LIST OF <br />PARAMETERS TU BE MUNITOREU. <br />ONCE A PLAN HAS BEEN APPROVED, MONITORING SHALL COMMENCE IN <br />ACCORDANCE WITH THE PLAN AND MONITORING DATA WILL BE SUBMITTED <br />TU THE DIVISION QUARTERLY. <br />The applicant plans to develop and use aground water well for water <br />needed on-site. A temporary use permit (No. 25724-F) for a 250 gpm <br />industrial well has been granted by the State Engineer. However, the <br />augmentation plan for use of water from this well has not been <br />finalized. Therefore the following stipulation is required: <br />Stipulation No. 5 <br />THE PERMITTEE MUST SUBMIT A COPY OF THE AUGMENTATION PLAN THAT <br />HN5 BEEN APPROVED BY THE STNTE ENGINEER'S OFFICE AND WATER COURT <br />FUR USE OF WATER FROM THE INDUSTRIAL WELL COVERED BY TEMPORARY <br />USE PERMIT IVO. 25724-F PRIUk TO USE OF ANY WATER FROM THE WELL. <br />A discussion of impacts of the mining operation on ground water quality <br />and quantity is contained in Section VII "Probable Hydrologic <br />Consequences of pining and Cumulative Impacts Assessment" of this <br />document. <br />