Laserfiche WebLink
<br />Jn~.n[ yLi, vt' i~iL UL n:l~V. t rV<<'L'HL btNLH - CORt. • <br />Page 2 <br />Final Grading, Survey and Inspection <br />Upon completion of backfill operations, the <br />a uniform slope and surveyed to assure that <br />less than 2 horizontal to 1 vertical. The <br />side of the pile was left in place to allow <br />soil by others. Upon completion of grading <br />visual inspection of the pile was performed <br />criteria had been met. <br />Engineer's Certification <br />pile was regraded tc <br />overall slopes were <br />sccess road up the <br />placement of top- <br />and surveying, a <br />to insure all design <br />I, Kirk A. Nobis, do hereby certify that the placement of fill, <br />compaction testing, engineering supervision and inspection of the <br />underground development waste at the Bear No. 2 portal bench was <br />done under my direction. <br />~~ ~ <br />A. Nobis <br />~ 2 G~~ <br />Colorado Registered <br />Professional Engineer <br />No. 19212 <br />DPC/jm <br />9-07-83 <br />