My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34489
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34489
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:56 PM
Creation date
11/23/2007 7:57:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
9/29/1983
Doc Name
Letter on Completed Backfilling of Portal No. 2 Bench
From
WEST ELK COAL CO INC
To
BEAR COAL CO
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Coal~pany, Inc. <br />Post Office Bo: 1 <br />Somerset. Colorado 81434 <br />Telephone 303 929 5015 <br />Curtis W. Foster <br />General Manager <br />iii iiiiiiiiuiuiii <br />999 <br />September 7, 1983 <br />S~l~' <br />Mr. William A. Bear, President <br />Bear Coal Company <br />Somerset, Colorado 81434 <br />Dear Bill: <br />• ~~ <br />R~~~~~~~ <br />SEP 2J 1983 <br />MINED LAND RErLAMATION DIVISION <br />Colo. Dept. of Natural f;ecources <br />west Elk Coal Company has completed backfilling of <br />the Bear Coal Company No. 2 portal bench with under- <br />ground development waste from the Mt. Gunnison No. 1 <br />Mine. Enclosed is information required by MLR re- <br />garding the placement of fill, compaction testing, <br />engineering supervision and inspection, and a draw- <br />ing of the as-built contours and profiles of the <br />development waste material. <br />Bear Coal Company will be responsible for reclamation, <br />monitoring, and stability of the backfilled area under <br />the existing mining and reclamation permits held by <br />Bear Coal Company. <br />If there are any questions <br />please contact Craig Hansen <br />engineering staff. <br />Sincerely, <br />Curtis W. Foster <br />General Manager <br />CWF/jm <br />regarding this project, <br />or Dennis Conn of our <br />cc: D. Conn W/Attachment <br />C. Hansen " <br />D. Mathews/CMLRD <br />
The URL can be used to link to this page
Your browser does not support the video tag.