Laserfiche WebLink
Carl Mount <br />July 15, 1988 <br />Page 2 <br />headcutting. Gully B, west of the old Wadge pit area, is a <br />result of runoff from a small watershed concentrating onto a <br />steep slope. <br />The remedial plan for-Gully A and B is: <br />Grade or regrade severe portions of gully to <br />improve and channelize flow path, minimizing <br />disturbance to adjacent established vegetation; <br />Install straw check dams anchored with steel posts <br />along length of each gully; <br />. Retopsoil areas that have been disturbed; <br />Complete disking, channelization and check dam <br />installation by late summer prior to seeding; <br />Seed with previously approved seed mix and rate; <br />Seed with annual grain at 10-20 lbs per acre; <br />Complete seeding in fall 1988 when soil moisture <br />conditions are more favorable. <br />Peabody will proceed with the above plan and schedule. If <br />you have any questions, please call. <br />Respectfully, <br />/~ 7 <br />James 5. Lunan <br />' Manager, Permits <br />bd <br />