Laserfiche WebLink
<br /> <br />Fulton Ditch Co.- Several meetings have been held on setback from the Fulton Ditch and <br />permission for the conveyor to cross the Ditch Company's property, <br />the meetings have been positive, and CAMAS personnel are <br />continuing to meet the Fulton Ditch Company on these items. A copy <br />of any agreement that CAMA5 and the Fulton Ditch Company <br />reach related to setback or any other item related the excavation <br />and/or reclamation plan details, will be submitted to the DMG. <br />Any agreement that is available by the time of permit issuance, <br />or in the preparation of the final booklet after permit issuance <br />containing all relevant conditions and documents, will be <br />included at the rear of this section. <br />United Power - Indicated by phone they had no objection to the proposed setbacks. <br />A copy of the United Power's letter stating no objection to the <br />proposed excavation setback from their structures located in <br />public right-of--way will be included at the end of this section. <br />U. S. West - Indicated by phone they had no objection to the proposed setbacks. <br />Sinclair Pipeline Co. -Indicated by phone they may comment during the process. <br />City of Northglenn - Indicated by phone they may comment during the process. <br />CCWCD - Indicated by phone they may comment during the process. <br />