My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34324
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:51 PM
Creation date
11/23/2007 7:54:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
General Documents
Doc Date
7/9/1999
Doc Name
PERMIT M-99-034 COOLEY RESERVOIR & FULTON WILDLIFE AREA PIT REVISED EXHIBITS
From
ADCO CONSULTING
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />('OOLEY RESERVOIR AND FULTON WILDLIFE AREA PIT <br />(Revised 07/09/99) <br />OTHER RELEVANT SITE INFORMATION <br />Cultural Resources - Clearance on Cultural Resources from the Colorado Historical Society is <br />included as page 3 of this section. <br />Traffic - A copy of the cover letter from the Traffic Impact Report is included as pages <br />4-7 of this section. <br />In preparing the MLRB permit application, various agencies were contacted preliminarily for their <br />input. All were sent a copy of the Slope Stability Analysis, and comments received to date are as <br />follows: <br />CDOT - CDOT's letter on the project is attached as page 8 of this section. <br />CDOT had no objection, except to request that any impact on <br />drainage facilities on 104's Avenue (SH44) be addressed. These <br />comments will be addressed by TuttleApplegate in the preparation of <br />their studies necessary to excavate within 400' of the S. Platte River. <br />Adams County- The Adams County Department of Public Work's comment that they <br />had no objection to the project's setbacks from County Roads is <br />attached as page 9 of this section. <br />Corp of Engineers- The Department of Army's Corp of Engineers commented in the <br />attached October 28, 1998 letter attached as page 10 of this section, <br />that they would require a formal wetlands inventory. Per this <br />comment, CAMAS has contacted for such an inventory to be <br />completed. <br />Public Service Co.- Provided an application form for application for processing to allow <br />the slurry wall to cross PSCo. right-of--way in two places. PSCo. <br />personnel indicated they felt the request was reasonable and could <br />probably be processed favorably in several months time. CAMAS has <br />initiated this application process. A copy of the draft agreement <br />with PSCo. is included at the rear of this section. If the revised <br />agreement with the changes that DMG has requested is available <br />by the time of permit issuance or in the preparation of the final <br />booklet after permit issuance containing all relevant conditions <br />and documents, then the revised agreement will be included at <br />the rear of this section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.