Laserfiche WebLink
<br />MR-64 Structure inventory April 1995 <br />MR-65 Development Drilling March 1995 <br />MR-66 Degas holes March 1994 <br />MR-67 Secondary concrete <br />containment April 1995 <br />MR-68 Degas holes April 1995 <br />MR-69 Relocate degas pumps April 1995 <br />MR-70 Corporate officers August 1995 <br />MR-71 Structure inventory map July 1995 <br />MR-72 Light use road/pumphouse July 1995 <br />MR-73 Extend reclaim tunnel October 1995 <br />MR-74 Hydro monitoring plan December 1995 <br />MR-75 NW-1 fan baffle November 1995 <br />MR-76 NW-1 comm. borehole December 1995 <br />MR-77 Concrete disposal October 1996 <br />Bond Releases since Renewal No. 2 (June 1994) <br />Bond Release I Description Date Approved Post-approval <br />liability <br />SL-Ol Phase I December 1997 $477,085.00 <br />Section III <br />Status of Stipulations <br />The stipulation history for the Golden Eagle mine was reviewed as part of the mid-term <br />review. The following is a discussion of the stipulations that were noted as active in the <br />database, or issued as a result of the last permit renewal (RN-02). Review included <br />investigation of the stipulation response file, revisions to the permit, and the findings document <br />-6- <br />