Laserfiche WebLink
<br />2.05-1 1(a), (b) and (c), shows ditch summary. Please revise the numbering of one of these <br />tables so there will not be two tables labeled 20(a) with different content. <br />28. Permit page 2.05-25(a) commits to irrigation of the pastureland areas. Pond 5 was <br />reclaimed and seeded in 1997. The Division is not aware of any irrigation having taken <br />place on the reclaimed pond 5 area. Please explain this deviation from the reclamation <br />plan. <br />Section VT <br />B n 'n <br />The Division currently holds bond # B2718871 in the amount of $ 477,085.00 issued by <br />Reliance Insurance Company for reclamation at the Golden Eagle Mine. This amount is <br />satisfactory to complete any reclamation at the site, including a complete re-seeding and <br />fertilization of the entire disturbed area. The mine has been granted a Phase I bond release for <br />the dismrbed area south of Highway 12. Details concerning this bond release can be found in <br />the bond release written fmdings for Bond Release No.l(SL-O1). <br />This concludes the initial phase of the mid-term review process. Please submit a technical <br />revision responding to these issues identified in Section V by September 18, 1998. <br />-14- <br />