Laserfiche WebLink
<br />Permit Number CO-0019 <br />Page 11 of 11 <br />Attachment II <br />Special Conditions <br />Em?ire Energy Corporation <br />Eagle No. 5 and No. 9 Mines <br />1. Within 60 days of permit issuance, Empire Energy Corporation must submit a <br />copy of the current roof control plan to the District Mining Supervisor, <br />Bureau of Land Management. <br />2. To ensure the protection of the golden eagle nest, no surface disturbance <br />will occur from January 5 to July 15 in the NW1/4NW1/4 of section 31, T. 6 <br />N., R. 91 W., 6th PM. <br />