Laserfiche WebLink
<br />To the south of Foidel Creek, operations at "4ine 1 and Eckman Park nave <br />?ntrai: C2~ :; ~3~ `.~^^,"7 the ~:Ja dge Seam 310ng a !~i ,^, Slope Ylhlch e.e tends from the <br />headwaters of Foidel Creek for several miles to the northeast. Mining began <br />along the northeast end of the dip slope in the vicinity of the i4ine 1 permit <br />area in the early 1960's, and mining operations have progressed from northeast <br />to southwest, with Eckman Park located to the southwest of i4ine 1. <br />i4ining and reclamation is ongoing in two pit areas at Eckman Park (the Area 51 <br />Pit and the Area 61 Pit). Mining, backfilling, topsoiling and reseeding has <br />been completed a*. Mine 1 and the major part of Eckman Park, and is being <br />accomplished in contemporaneous fashion in Area 51 and Area 61. A single <br />dragline removes overburden from both active pit areas, and the applicant <br />projects a production rate of 1.2 million tons/year for the remainder of the <br />Life-of-Mine in Eckman Park. <br />Area 61 pits are oriented along the dip of the coal seam such that mining <br />progresses from northeast to southwest, while area 51 pits are oriented <br />parallel to the strike of the coal seam such that mining progresses up the dip <br />slope from northwest to southeast. During initial operations in Eckman Park, <br />boxcut spoils were placed in two approved excess overburden disposal areas <br />along the toe of the dip slope adjacent to Foidel Creek. Construction of both <br />overburden piles has now been completed, and overburden from each successive <br />dragline cut is spoiled into the preceding cut. Dragline spoil ridges are <br />dozed and graded to create slope configurations approximating ±hP original <br />contours. Grading is followed by topsoil distribution and stabilization, <br />seeding and planting. <br />Existing facilities along the base of the dip slope on either side of Foidel <br />Creek include a shop and warehouse complex covering approximately 28 acres; <br />the Tipple No. 2 facility which covers approximately 15 acres and includes a <br />raw coal stockpile, stoker coal facility, truck dump, primary and secondary <br />crushers, a sampling building, covered conveyors, and crushed coal stockpile; <br />the 16,000 sq. ft. main office complex; a 3 acre explosives bunker; and a 14 <br />acre equipment construction, servicing and storage area. Numerous <br />sedimentation ponds remain in place to control runoff from disturbed areas of <br />Eckman Park, Mine 1 and Mine 2, Pond A, a sedimentation reservoir ~dhich is <br />located on the South Fork tributary of Foidel Creek controls disturbed runoff <br />from the major portion of Eckman Park. <br />Final reclamation will entail removal of all buildings and structures with the <br />exception of sediment ponds approved for use as stock ponds. Haul roads will <br />he eliminated or reduced in size to he appropriate as ranch roads. Other <br />facility areas will be graded, ripped, topsoiled and seeded. <br />9 <br />