Laserfiche WebLink
,, <br />9. A mobile concrete batch plant will be employed. We were unsure how this batch plant is permitted. <br />Mike thought that the CDPH&E issues permits for mobile batch plants. I indicated that if a mud pit <br />or disturbance on the ground will be associated with the batch plant, it will need to be included in a <br />revision. <br />I indicated to Tom and Mike that these changes should be able to be handled as a TR, along with <br />revision to the reclamation cost estimate for the changes. I also outlined time scale for a TR so NKC <br />can plan accordingly how quickly they need to get a revision in. <br />Tom and Mike also asked if they can begin pond excavation next week, 2/26? I told them that if they <br />keep within the areas currently approved for disturbance they should be fine. <br />