My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34093
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:44 PM
Creation date
11/23/2007 7:48:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983058
IBM Index Class Name
General Documents
Doc Date
3/31/1995
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR RN2
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Status: Terminated <br />Technical Revision No. 7 was submitted and conditionally approved on February 1, 1995. <br />Stipulation No. 17 was attached. <br />Stipulation No. 17 <br />THE OPERATOR WILL OBTAIN DOCUMENTATION FROM MSHA WHICH VERIFIES THAT THE <br />PLANNED AND IMPLEMENTED PORTAL CLOSURE METHOD, FOR BOTH THE MWE SITE AND <br />THE SALES AREA, IS IN COMPLIANCE WITH MSHA REQUIREMENTS. SUCH DOCUMENTA- <br />TION MUST BE SUBMITTED NO LATER THAN APRIL 1, 1995. <br />Status: Terminated <br />This stipulation was terminated on March 9, 1995, based upon previously documented <br />conversations with MSHA personnel and a mine site inspection conducted by the Division on <br />January 26, 1995. <br />Stipulation No. 18 <br />THE PERMITTEE WILL SUBMIT TO THE DIVISION SEMI-ANNUAL MONITORING REPORTS FOR <br />BOTH THE TWIN PINES MONITORING WELL AND FOR THE CALDIROLA MINE WELL. THE <br />MONITORING REPORTS MUST WCLUDE QUARTERLY WATER LEVEL, PH AND ELECTRO- <br />CONDUCTIVITY MEASUREMENTS. <br />THE QUALITY OF THE WATER IN WELL N0. TPW-1 WILL BE MONITORED SEMI- <br />ANNUALLY FOR THE FOLLOWING PARAMETERS: <br />PH ALUMINUM <br />CONDUCTIVITY SODIUM <br />TDS SULFATE <br />TOTAL HARDNESS ARSENIC <br />SAR BORON <br />BICARBONATE CADMIUM <br />CALCIUM COPPER <br />CARBONATE IRON <br />CHLORIDE LEAD <br />MAGNESIUM MANGANESE <br />NITRATE MERCURY <br />POTASSIUM SELEMUM <br />THIS FULL SUITE SAMPLING OF WELL N0. TPW-1 WILL BE CONDUCTED IN APRIL AND <br />OCTOBER OF EACH YEAR, AND THE REQUIRED SEMI-ANNUAL MONITORWG REPORTS WILL <br />BE SUBMITTED BY TUNE 1 AND DECEMBER I OF EACH YEAR. <br />Status: Active <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.