Laserfiche WebLink
~' <br />Mr. David~v rl' mil, ~ , Z - 2 - March 9, 1990 <br />~~Q D <br />~~ <br />~~~~~ C. Will all of the northern topsoil stockpile be reclaimed in vear 20 <br />C ~ ,~Dr will Dart of it be reclaimed in years 12 and 13 as the exhibit <br />(~ ~~~~ ~ ~i5 now depicts? Please label this area as appropriate. <br />i ~'~ p~ ~ P- <br />~~ 4 D. The topsoil removal variance areas will be graded to drain towards <br />Trout Creek. Therefore, the Division assumes that these regraded <br />areas will be reclaimed concurrent with the areas adiacent and to <br />d ~ the west. Please extend the EOTR lines appropriately so that this <br />is clear. <br />E. Please indicate, on the exhibit, when the southern topsoil <br />V stockpile area will be completed in regard to final topsoil <br />t- replacement. <br />F. The lines that delineate topsoil replacement around the ~4offat Area <br />sediment pond are somewhat unclear. Are all areas except for the <br />O ~ , haul road, sediment pond, and access roads to the pond and the <br />8•..-t'~ Trout Creek Diversion to be topsoiled by the end of year 7? <br />IN <br />G. Please indicate where topsoil for covering the regraded sediment< <br />~~ pond will be stored. C~.a,..-92 `('~' ~ 3~Z ~ ~`^-~~ <br />5. Please state in the appropriate text location whatP topsoil thickness vlill ~ r ~ <br />II 1~`~S be used for reclamation of the area beneath the footprint of the <br />Moffat Area southern topsoil stockpile. <br />9. Panes 4.6-33 and 34 discusses the small area exemptions and states that <br />one will be shown on Exhibit 4.6-2. A careful review indicates that the <br />area around the sedimentation pond appears to be the missing small area <br />exemption. Please address this omission. Rule 2.04.7(2)(b)(ii). <br />11. The phreatic surface discussion in the sedimentation pond embankment is <br />being reviewed. Any further clarification or ouestions will be forwarded <br />to you within ten days of the date of this letter. <br />12. P&M should specify that the additional set of wells to be installed in <br />the backfilled spoils of the year 2 or 3 cut will be located near the <br />dormslope boundary of the pit, in a location analogous to that of well <br />series 215. Further, P&M should indicate that the installation will <br />include two Diezometers, similar to well series 215 and 218 and that the <br />lower piezometer will be completed in the Lower Wadge Seam, and the upper <br />piezometer in the overlying spoil. P&M should indicate their plan to <br />install an appropriate bentonite seal in the interburden section <br />iernediately above the Lower Wadge Seam and below the pit floor. Finally, <br />PBId should indicate that this well series should be installed in the <br />location of the second Cut area as soon after backfilling and grading as <br />possible. <br />15. Exhibit 4.3-1 does not label the undisturbed area southeast of the <br />~,^ c a~- sedimentation pond. Does P&M intend to strip the topsoil from this <br />W"1 r , ,~,,~ area? Rules 1.04(7) and 1.04(36). <br />G T_ <br />~ ~.>Z S <br />