Laserfiche WebLink
<br /> <br />G81-048: bid 1ouA~ dnR: ). Nekon 2 <br />- Page 7, Pazagraph 3, line 1. Should this reference pond 22-P10 instead of 22-Pla? <br />-Page 7, Pazagraph 5, line 2. Do we really want a total riprap thickness of 3 feet? <br />I have not looked at the design plans, nor am I a hydrologist but it sounds really <br />thick. Is this what our designs show? Task 10 on page 8 also designates 3 feet of <br />rip-rap. <br />-Page 8, Pazagraph 8 (Task #8), line 3. Ditch 22-P10 should probably refer to 22- <br />D10. <br />-Do we need to add any provisions for signage along the public road for work <br />occurring on We Section 15 ponds that might interfere with traffic? <br />Anyhow, these aze the items that gave me questions. They may akeady be answered by the <br />designs or the "General Bid Specifications 1993". I hope my comments aze helpful. Do you <br />have any extra "General Bid Document 1993" copies? If so, Pd like a copy. Thanks. <br />c:\jhb\c81048\reclbid.jn <br />cc: Dan Hernandez <br />