Laserfiche WebLink
<br />Page 2 <br />GEC's Preliminary Adequacy <br />Rule <br /> <br />7.04.10 A detailed plan and time schedule for the collection and analysis of <br />vegetation baseline information must be provided. <br />She applicant should commit to the seed mixes proposed by hfr. Patch; at <br />present these appear as his recommendations. <br />7.04.11 Since the partial species Zist include beaver, the riparian habitats should <br />be identified. The species list should be site specific for the permit and <br />adjacent areas. <br />7.09.12 The Division accepts the applicant's assertion that no prime farmlands <br />exist within the permit area on the basis drat no suitable soils have been <br />identified by the sCS and the area Eras not been used for cropland. <br />'. OS The mine operations and reclamation plans will not Le reviewed at this <br />time, pending submission of a revised plan. <br />:.06.8 Zn order that the Division may rnakc c/rittcrr findings, as required in <br />Rule 2.07.6, based on information included in the permit application, <br />the applicant must submit maps delineating tl{c areal distribution of <br />unconsolidated stream-laid deposits sub-irrigated areas, and streams, and <br />a description of local agricultural practices (specifically, the regional <br />flood irrigation practices, or lack tlrcrcof). <br />'.06.9 If the applicant intends to propose auger mining techniques, the performance <br />standards of Rule 4.23 must be addressed. <br />.T:" <br />