My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33947
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33947
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:40 PM
Creation date
11/23/2007 7:46:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
General Documents
Doc Date
5/1/1999
Doc Name
DOCUMENTED QUOTE GRASSY GAP COAL MINE MAINTENANCE PROJECT PKA-9-XXX
From
DMG
To
INTERESTED CONTRACTORS
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
accomplish the following <br />- The CMP riser shall be cut so that the top surface of the riser is six inches (6") above the <br />elevation of the embankment immediately adjacent to the riser. Because the embankment <br />slopes upward to its crest, the CMP cut will pazallel the slope angle. CONTRACTOR shall <br />properly dispose of the remnant CMP material off site. <br />- The embankment shall be excavated a minimum of five feet in all directions (including <br />towards the pond) from the CMP riser. The depth of the excavation shall be no less than one <br />foot six inches (1' 6") below the top of the existing concrete apron. CONTRACTOR shall <br />exercise appropriate care and caution in order to maintain the integrity of the CMP riser and <br />of the horizontal CMP spillway. <br />- Six inches (6") of hydrated bentonite shall be placed on the base and on the sides of the <br />excavation. The bentonite shall be sufficiently hydrated so that it slumps rapidly when <br />placed on a board elevated to forty five degrees (45 °). Due to the fluid nature of the <br />bentonite, it will be necessary to construct and place a form within the excavation prior to <br />placing the bentonite slurry. <br />- Concrete, having a minimum compressive strength of 3,500 psi at twenty eight (28) days will <br />be poured into the excavation after placement of the bentonite. Concrete may be mixed at <br />the site, or may be delivered as `ready mix' at CONTRACTOR'S option. If the concrete is <br />mixed on-site, equipment and mixing procedures shall conform to ACI 301, Chapter 7. If <br />'ready mix' is used, it shall be mixed and transported in accordance with ASTM C 94. <br />Concrete shall be thoroughly compacted by means of a suitable mechanical vibrator. <br />- Upon completion of concrete curing, the dirt excavated from the embankment shall be <br />replaced on top of the new concrete. The material shall be replaced in such a manner so that <br />the slope of the embankment is returned to its original condition, and so that the top of the <br />CMP riser is six inches (6") above the elevation of the embankment slopes. The fill shall be <br />mechanically compacted during placement. <br />A hinged steel grate shall be placed over the top of the CMP riser. The grate shall be <br />constructed using 1-1/4" structural rebaz welded on eight inch (8") centers in both directions. <br />Two (2) extra heavy duty hinges, having non-removable pins shall be welded to the CMP <br />riser and to the steel grate cover on the uphill side of the riser. A hasp, constructed of 3/8" <br />steel, and having a circular hole of ~/z" diameter, shall be welded to the CMP riser and the <br />steel grate on the down hill side of the riser. <br />Measurement and Payment <br />There will be no measurement for payment. Payment for this task will be reflected in a lump <br />sum bid under Item 3 on the Bid Schedule. This lump sum bid will cover all costs for cutting of <br />the CMP riser, offsite disposal of the excess CMP material, excavation of the embankment, form <br />construction, purchase and installation of the bentonite, purchase and installation of the concrete, <br />backfilling and compaction over the concrete, construction and installation of the hinged steel <br />grate. Payment shall be as this task is completed and approved by the PROJECT MANAGER. <br />Such payment shall be considered full compensation for all labor, materials, equipment and all <br />other items necessary and incidental to the completion of Task 3, Sediment Pond Dewatering <br />Device Repair. <br />
The URL can be used to link to this page
Your browser does not support the video tag.