Laserfiche WebLink
the figure of $25,000 to $30,000. <br />TASK 4: Hazardous Waste rums <br />The bid spec. work for this task has been completed. The <br />contractor stated that he could do this work with all of the other <br />stuff with out a problem, so I feel that we should include it in <br />the bid. <br />TASK 5: Reveaetation <br />Revegetation could be included in this bid package or in a separate <br />bid package. I recommend that we get an experienced vegetation <br />person to write the bid specs. on this project. It includes <br />revegetation of the coal storage area, silo area, and the refuse <br />pile. This bid could possibly include re-seeding the West end of <br />mine site that was done in 1990. <br />One final note, due to the recent land slides in the area I was not <br />able to access the drill holes. Harry flew in the location of the <br />drill holes. There are some out there, but we will not be able to <br />access the holes until the roads are cleared. I recommend that we <br />put off this task until we can access the site to determine the <br />number of drill holes requiring reclamation. <br />