Laserfiche WebLink
<br /> <br />Mid-Term Review 7 November 27, 1985 <br />MR19 - Modify Configuration and Use of "Blister" - August 5, 1982 Request <br />The only written documentation regarding approval of this revision is a <br />statement contained in the November 11, 1982 inspection report indicating that <br />the approval letter was on file at the mine office. Please check your records <br />to see if Western Fuels has a copy of the approval letter. The present area <br />occupied by the "blister" needs to be depicted on an appropriate map within <br />the permit application. <br />TR03 - Excavation Along Conveyor - August 24, 1482 Request <br />Map No. 106 - Overland Conveyor and Maintenance Road Plan and Profile Sheet 1 <br />(one) needs to be revised as shown on the draft copy submitted with the <br />revision request. Additional permit maps affected by the revision should also <br />be revised, i.e. the appropriate D-Portal Area Site Grading Plan Map. <br />MR20 - Construct Telecommunications Site - October 7, 1982 Request <br />The appropriate surface facilities map(s) within the application need to be <br />revised to show the location and configuration of the telecommunications <br />facility and associated access road. Appropriate maps should include Map 11, <br />Map 15 and Map 55. Western Fuels may want to incorporate the map submitted <br />along with the revision request into the permit as well. The operations <br />description portion of the application should be amended to include this <br />additional facility. The removal of this facility should be described in the <br />reclamation plan section of the application. <br />TR04 - Construct Slot Storage Stockpile -March 8, 1983 Request <br />Western Fuels should clarify whether this area has been permanently reclaimed <br />or is anticipated for some future use as a temporary coal stockpile. If <br />Western Fuels anticipates any future use of this area, then all appropriate <br />maps and portions of the text within the permit will need to be revised <br />accordingly. The approved drainage control design and supporting calculations <br />will need to be incorporated into appropriate sections of the permit. Please <br />refer to drawings 2-1-83 and 2-83(2) submitted on June 8, 1983. <br />MR21 - Topsoil Small Area Exemption - April 27, 1983 Request <br />'The design and configuration of the approved sediment control system for the <br />topsoil stockpile needs to be depicted on an appropriate map within the permit <br />application. <br />Tk05 - Increase Refuse Disposal Area Sideslopes - June 29, 1983 Request <br />This request is still incomplete. No response is necessary at the present <br />time. <br />Mk22 - Install Heliport - August 4, 1983 Request <br />