Laserfiche WebLink
a <br />Mid-Term Review <br />9 <br /> <br />November 27, 1985 <br />MR25 - Additional Water Discharge Point <br />Western Fuels should amend the permit application to list this and all other <br />current discharge points for which an NPDES Permit has been obtained. <br />MR26 - Refuse Area Haul Road Extension - April 4, 1984 Request <br />Map 77 should be amended to show the as-built location and configuration of <br />the new haul road segment. <br />MR27 - Antifreeze Spillage Control Plan - March 15, 1984 Request <br />The approved plan needs to be incorporated into the appropriate section of the <br />permit application. Any containment pits or other structures constructed as <br />part of the plan need to be depicted on an appropriate map within the permit <br />application. <br />MR28 - Modify 5-Year Mine Plan - May 30, 1984 Request <br />This revision regarded minor changes to the underground sequencing and <br />orientation of entries and submains. Map 131, Map 119-Revision 1 (one) (now <br />Revision 3 (three)), and the D-seam mine plan map will need to be revised <br />accordingly. <br />TRO8 - Halandras Trash Dump - March 11, 1985 Request <br />The Operations Description portion of the text needs to be amended to provide <br />a description of the facility. The description should include information on <br />the size, use, scheduled development, sediment control and topsoil salvage <br />plan for the facility. The reclamation plan portion of the permit should be <br />revised to provide a description of how the area will be reclaimed. The <br />"General Surface Map" submitted with the request does not appear to be a part <br />of the permit application. Western Fuels should either add this as a numbered <br />map within the application or amend an appropriate map presently within the <br />permit to show the location of the facility. An additional plan view map <br />should be incorporated into the permit which shows the present and proposed <br />disturbed area, permit boundary, size and location of disposal pit(s) and <br />topsoil stockpile(s), and the sediment control system for the facility. <br />TR09 - Mine Plan Re-Orientation - April 9, 1985 Request <br />Map 19-Revision 3A and Map 131-Revision 2 need to be incorporated into the <br />permit application. <br />TR10 - Advance Opening of RDA Subareas 2 and _3. - June 11, 1985 Request <br />Map 77 needs to be revised to show the present as-built configuration of the <br />refuse area, including the merging of subareas 2 (two) and 3 (three) into one <br />area and the location and size of the new topsoil and subsoil piles. The <br />