Laserfiche WebLink
_29_ <br />1. Road grades were low, generally 3-6%. <br />2. This segment of road does not cross any defined stream channels or <br />drainages. <br />3. The watershed above the road is small (50 ac. max..). <br />The haul roads at the mine have been certified by a registered professional <br />engineer that they have been constructed according to designs contained in the <br />permit application. <br />Two types of light-use roads are used at the mine, The first type consists of <br />pit roads, which changed frequently with the pit configuration. These roads - <br />are of stable configurations and within the sediment control system. <br />The second type of light-use road is the "perimeter" road. This road was <br />required by BLM to act as a buffer between the mine and surrounding BLM <br />roads. The road is used only for periodic monitoring and inspections. The <br />design, location, drainage, surfacing, construction, and reclamation plans for <br />these roads are more than adequate to meet the performance standards of 4.03.3. <br />The operation is in compliance with the requirements of this section. W S <br />` XXI. Bonding - Rule 2.05.4 (2)(b) and Rule 3 ~ <br />Walden Coal Company has agreed to post a performance bond in the amount of \ <br />~ 5536,000.00. The Division has determined that this amount will be sufficient\~~`~e.~` <br />~0 to cover the cost of reclamation at the mine. ''(( <br />~,~ Pursuant to rules 2,07,6(2)(j) and 3.02,1(1), the performance bond in this ~, gLA~~ <br />~, amount must be filed with the Division, payable to the State of Colorado, \_ <br />before a permit will be issued, and within five days of the date that the SoM~`-- <br />proposed decision becomes final. <br />The operation is in compliance with the requirements of this section. ~ ~~.~ > <br />XXII. Sealin of Drilled Holes and Under round 0 enin s - Rules v~~i~ <br />g an ~" <br />The Division has reviewed the permit application for compliance with the <br />requirements of this section. Information can be found on page F-12 of the <br />permit application. <br />All drill holes, wells and underground openings will be appropriately sealed. <br />The operation is in compliance with the requirements of this section. <br />XXIII. Miscellaneous Compliance - Rules 2.05.6(5), 4.02, 4.12, 4.19, 4.21, <br />a--~ ~- <br />The Division has reviewed applicable sections of the application for <br />compliance (Section B, Section D and Section E of the application). <br />