Laserfiche WebLink
-31- <br />XXVII. Compatibility with Anticipated Adjacent 0 <br />+s~e -zra^n a^ <br />aerations - Rule <br />Pursuant to Rule 2.07.6(2)(1), the Division finds that the operation will not <br />be inconsistent with any other surface coal mining and reclamation operations <br />anticipated to be performed in areas adjacent to the proposed permit area. <br />The operation is in compliance with the requirements of this section. <br />XXVIII. Reclamation Fees Required by 30 CF R. Chanter VII. Subchapter R - <br />Based on communication with OSM personnel and verification using the AVS <br />system, Walden Coal Company has paid all reclamation fees as required by <br />30 CF R, Chapter VII, Subchapter R. <br />Pursuant to rule 2.07.6(2)(0), the Division finds the operation to be in <br />compliance with the requirements of this section. <br />0289E <br />