<br />25 <br />The applicant proposes to construct light-use roads along pipeline, <br />transmission, and inspection corridors depicted in Volume V, figure 4.2-3. <br />The applicant states in the application: "When the final designs and surveys <br />are completed in line with the BLM requirements, Storm King Mines will <br />indicate the proposed light use roads on Figures 4.2-3, 4.2-4 and 4.2-5 and <br />will construct said roads in accordance with Section 4.03.3 complying with the <br />location restrictions, grade, pitch, alignment, cuts, embankments, topsoil <br />removal, revegetation cover, drainage, surfacing, maintenance and reclamation <br />conditions enumerated therein." Since the applicant has not submitted a plan <br />for these light-use roads, the Division cannot currently approve the portion <br />of the proposed operation. The following information is necessary before the <br />Division can approve this portion of the proposed operation: <br />Requirement No. ]1 <br />PRIOR TO APPROVAL OF ANY LIGHT-USE ROADS, THE APPLICANT MUST SUBMIT ANO <br />RECEIVE, IN WRITING, DIVISION APPROVAL OF PLANS AND DESIGNS MEETING THE <br />REQUIREMENTS OF RULE 4.03.3. <br />In addition to the above-mentioned light-use roads, the applicant will use <br />roads to ground water monitoring stations. The roads to these monitoring <br />stations were constructed under an exploration plan approved by the Division. <br />The Division requested in the preliminary adequacy review that these roads be <br />shown on a map and the information required by Rule 4.03.3 be submitted. The <br />applicant's response to this comment was insufficient; therefore, the <br />following information is required before the Division can approve the permit <br />application: <br />Requirement No. 12 <br />THE APPLICANT MUST SUBMIT A MAP SHOWING THE EXISTING LIGHT-USE ROADS <br />USED TO ACCESS MONITORING FACILITIES. IN ADDITION, THE INFORMATION <br />REQUIRED BY RULE 4.03.3 MUST BE SUBMITTED. IF ANY OF THESE ROADS ARE <br />NOT IN COMPLIANCE WITH RULE 4.03.3, A PLAN TO BRING THEM INTO <br />COMPLIANCE MUST BE SUBMITTED. <br />