Laserfiche WebLink
<br />23 <br />XVIII. Mine Facilities, Coal Handlin Structures, and Su ort Facilities - <br />Rules 2.05.3 3 2.05.3 7 4.04 <br />Information concerning these facilities can be found on pages 4-29 through <br />4-40c of Volume I of the permit application. <br />The surface facilities are to be built in two phases. These two phases are <br />reflected in figures 4.2-7A, which shows the development phase (T985-86), and <br />4.2-7 and 4.2-8, which show the final, full production phase. <br />During the development phase SKM will be using an off-site loadout maintained <br />by the railroad. <br />Questions and concerns which during the permit review regarding structure <br />locations, construction phasing, open coal storage, and conveyor <br />construction. These issues have been adequately resolved through subsequent <br />submittals. <br />The proposed operation is in compliance with the requirements of this section. <br />