Laserfiche WebLink
~~ <br />lz <br />Requirement No. 4 <br />THE APPLICANT MUST RECEIVE DIVISION APPROVAL IN WRITING OF A REVISION <br />TO THE APPROVED PERMIT APPLICATION OF: <br />1) A DETAILED PLAN SHOWING HOW THE TOPSOIL STOCCKPILES WILL BE <br />PROTECTED FROM EROSION BY RUNOFF FROM THE AREA ABOVE THE STOCKPILES. <br />2) A PLAN MEETING THE REQUIREMENTS OF RULE 4.03 FOR ROADS TO THESE <br />AREAS. <br />3) A REVISED TOPSOIL SALVAGE PLAN WHICH INCLUDES SALVAGE OF TOPSOIL IN <br />THE PROPOSED BORROW MATERIAL STOCKPILE AREA. <br />4) A REVISED TOPSOIL SALVAGE AND REPLACEMENT PLAN WHICH INCLUDES THE <br />SEPARATE STOCKPILING OF A PLUS B FROM C HORIZON MATERIAL, AND THE <br />REPLACEMENT OF C HORIZON MATERIAL PRIOR TO REPLACEMENT OF A AND B <br />HORIZON MATERIAL. <br />Upon completion of backfilling and grading operati <br />redistributed. Approximately 12 inches of topsoil <br />entire disturbed area. This should be adequate to <br />the majority of the revegetation species have root <br />within this or lesser depth, and the soils exhibit <br />limit plant growth. <br />ins, topsoil will be <br />will be replaced over the <br />achieve reclamation since <br />systems which concentrate <br />no properties that should <br />With satisfactory resolution of the above stipulations, the proposed operation <br />will be in compliance with topsoil requirements. <br />