Laserfiche WebLink
<br />4. GATHER ALL BASELINE DATA AS REQUIRED IN THE ABOVE- <br />REFERENCED TECHNICAL REVISION, BEFORE MINING PROCEEDS <br />W ITHIN A 1 MILE RADIUS OF THE DAM. <br />5. PROVIDE A FINAL REPORT AND IMPACT ANALYSIS, BY A SECOND <br />TECHNICAL REVISION', AT LEAST 90 DAYS PRIOR TO ANTICIPATED <br />MINING W ITHIN ONE MILE OF THE DAM. <br />MINmG WITHIN ONE MILE OF THE TERROR CREEK RESERVOIR ($RUCE <br />PARK DAM) WILL NOT BE .APPROVED UNTIL ALL NECESSARY <br />MONITORING DATA, ANALYSES, REPORTS AND SUBSIDENCE CONTROL <br />PLAN DETAILS ARE APPROVED, BY THE SECOND TECHNICAL REVISION, <br />AND IT IS SHOWN THAT SUCH MINING WILL NOT ADVERSELY IMPACT <br />THE DAM. <br />10. PRIOR TO AFFECTING USDA-FOREST SERVICE (FS) WATER RIGHTS BY <br />MINING, THE OPERATOR WILL SUBMIT TO THE DNISION FOR <br />APPROVAL, A TECHNICAL REVISION THAT INCLUDES 1) A REVISED <br />MAP 23, "WATER RIGHTS LOCATION" AND REVISED TEXT THAT <br />DESCRIBE THE FS WATER RIGHTS WITHIN THE PERMIT AND ADJACENT <br />AREA, AND 2J VERIFICATION THAT A COURT-APPROVED WATER <br />AUGMENTATION PLAN IS IN EFFECT FOR THOSE FS WATER RIGHTS <br />WITHIN THE PERMIT AND ADJACENT AREA THAT MAY BE <br />CONTAMINATED, DIMINISHED OR INTERRUPTED BY MINING. <br />12. THE PERMIT RENEWAL OF THE BOWIE N0. 2 MINE IS CONDITIONED <br />UPON THE RESOLUTION OF KENTUCKY CITATION NO. C-89-081-414-01 <br />(PERMIT NUMBER 4977004 FOR STAR FIRE MINING; OF VIRGINIA <br />CNIL PENALTY VIOLATIONS AND BOND FORFEITURES AND WEST <br />VIRGINIA VIOLATIONS AND BOND FORFEITURES UNDER THE PITTSTON <br />SETTLEMENT; OF THE WEST VBZGINIA RECON VIOLATIONS (WV <br />0014783 UNDER PAYMENT PLAN; AND OF THE KENTUCKY CIVIL <br />PENALTIES, CESSATION ORDERS AND BOND FORFEITURES UNDER THE <br />ISLAND CREEK SETTLEMENT. PROOF OF RESOLUTION AND <br />SETTLEMENT SHOULD BE SUBMITTED TO THE DNISION OF MINERALS <br />AND GEOLOGY AS SOON AS THEY BECOME AVAILABLE <br />I3. APPROVAL OF PERMIT RENEWAL NO. 1 IS CONDITTONED UPON THE <br />SUBMITTAL OF THE FOLLOWING: 1J THE FINAL APPROVED NPDES <br />PERMIT THAT WCLUDES OUTFACES FOR POND J AND POND K; 2J THE <br />FINAL APPROVED CDOT ACCESS PERMIT FOR THE TEMPORARY <br />ACCESS ROAD NEEDED FOR THE CONSTRUCTION OF THE MAINLINE <br />RAIL SWITCH; AND 3) THE FINAL APPROVED ROAD USE AGREEMENT <br />FROM DELTA COUNTY FOR COUNTY ROAD 4365, IF THAT COUNTY <br />ROAD IS TO BE USED FOR ACCESS FOR THE CONSTRUCTION OF MINE <br />FACILITIES. <br />