Laserfiche WebLink
RIDER TO MININTG PERMIT <br />Permit Date: Apri14, 2002 <br />Permit No: C-1996-083 <br />The following additional stipulations form an integral part of the foregoing permit: <br />Stipulation No. <br />Description <br />9. A DETAILED SUBSIDENCE STUDY FOR TERROR CREEK RESERVOIR DAM <br />(BRUCE PARK DAM) WILL BE COMPLETED AND APPROVED PRIOR TO <br />MINII~'G WITHIN ONE MILE OF THE DAM. THE STUDY WILL ESTABLISH <br />BASELIIvB CONDITIONS, POTENTIAL MINING-INDUCED SEISMICITY AND <br />POTENTIAL TRANSLATED EFFECTS TO THE DAM. <br />BY SEPTEMBER 1, 2001, BOWIE RESOURCES WILL SUBMIT A <br />TECHNICAL REVISION TO THE PERMIT ADDRESSING THE <br />INVESTIGATION, DATA COLLECTION, ANALYSIS, AND MONITORING <br />PLAN TO ENSURE THE SAFETY AND INTEGRITY OF THE TERROR CREEK <br />RESERVOIR DAM (BRUCE PARK DAM). THE REVISION MATERIALS WILL <br />INCLUDE, BUT NOT BE LIMITED TO, DATA, A TECHNICAL REPORT, <br />COMPLIANCE SCHEDULES, A SUBSIDENCE CONTROL PLAN, A DETAILED <br />MONITORING PLAN SPECIFIC TO POTENTIAL SEISMICITY AND ANY <br />OTHER POTENTIAL IMPACTS INDUCED BY LONGWALL MINING. IN <br />ADDITION, THE SPECIFIC COMPLIANCE DATES AND MEASURES WILL BE <br />THE FOLLOWING: <br />I . JULY 1, 2001 -COMPLETE THE DRILLING PROGRAM, AS REFERENCED <br />IN THE COLORADO DNISION OF WATER RESOURCES LETTER TO THE <br />DNISION, DATED FEBRUARY 9, 2001, INCLUDING INSTALLATION OF <br />PIEZOMETERS OR OTHER DOWN-HOLE INSTRUMENTATION. <br />2. SEPTEMBER 1, 2001 -SUBMIT THE RESULTS OF THE INVESTIGATION <br />AND SEISMIC EVALUATION OF THE STRUCTURE, INCLUDING <br />RECOMMENDATIONS FOR ANY ADDITIONAL INSTRUMENTATION, WITH <br />THE ABOVE-REFERENCED TECHNICAL REVISION FOR DNISION REVIEW <br />AND APPROVAL. <br />3. DECEMBER 1, 2001 -INSTALL ANY ADDITIONAL INSTRUMENTATION <br />IN ACCORDANCE WITH THE FINAL INSTRUMENTATION PLAN APPROVED <br />IN THE ABOVE-REFERENCED TECHNICAL REVISION. <br />(#3 WAS NOVEMBER 1, 2001, EXTENDED TO DECEMBER 1, 2001) <br />