My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33508
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:27 PM
Creation date
11/23/2007 7:39:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
3/6/2001
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR RN1
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STIPULATION NO. 13 <br />SENECA COAL COMPANY SHALL PROVIDE PROOF OF RESOLUTION OF KENTUCKY <br />CNIL PENALTY VIOLP:fIONS AND BOND FORFEITURE ASSOCIATED WITH PERMff <br />8980140 AS SOON AS IT BECOMES AVAILABLE. <br />STATUS: Future. <br />STIPULATION N0.14 <br />APPROVAL OF MINOR REVISION NO. 13 FOR THE YOAST MINE IS CONDITIONED UPON <br />THE RESOLUTION OF WEST VIRGINIA CESSATION ORDER NO. 13 ASSOCIATED WITH <br />PERMIT NUMBER E012500 FOR THE MARTINKA COAL COMPANY. PROOF OF <br />RESOLUTION SHOULD BE SUBMITTED TO THE COLORADO DNISION OF MINERALS <br />AND GEOLOGY AS SOON AS ff BECOMES AVAILABLE. <br />STATUS: Future. <br />STIPULATION NO. 15 <br />WITHIN 180 DAYS OF PERMTf REVISION NO.1 APPROVAL AND PRIOR TO <br />CONSTRUCTION OF POND 14, THE APPLICCANT SHALL SUBMIT A TECHNICAL <br />REVISION TO THE YOAST PERMIT WHICH DEMONSTRATES THAT POND 14 <br />EMBANKMENT HAS A NIINIMUM STATIC SAFETY FACTOR OF 1.5. THE STRENGTHS OF <br />MATERIALS MUST BE DETERMINED, AND AN ANALYSIS WITH STTE-SPECIFIC <br />STRENGTH PARAMETERS DEMONSTRATE A MINIMUM FACTOR OF SAFETY OF 1.5. <br />STATUS: Complied with 07/05/2000. Stipulation No. 15 has been satisfied by approval of TR- <br />14. <br />STIPULATION NO. 16 <br />THE CONSTRUCTION OF HAUL ROAD "D" BETWEEN POND 012 AND HAUL ROAD "B" <br />EXTENSION HAS BEEN COMPLETED. AS SOON AS WEATHER PERMffS BUT NO LATER <br />THAN JULY 1, 2001, SENECA COAL COMPANY MUST SUBMIT THE AS-BUILT <br />CERTIFICATION FOR THE PORTION OF HAUL ROAD "D" THAT HAS BEEN <br />CONSTRUCTED TO DATE. <br />Summary <br />The Review Process <br />Seneca Coal Company submitted an application for a new permit on November 16, 1994. The <br />application was deemed complete on November 21, 1994, and notification of the complete <br />Yout Mine 6 Much 6, ?001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.