My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33508
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:27 PM
Creation date
11/23/2007 7:39:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
3/6/2001
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR RN1
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. WHETHER MINING OPERATIONS WILL RESULT IN MATERIAL DAMAGE <br />TO THE QUALITY OF SURFACE WATER SUPPLYING THE ALLUVIAL VALLEY <br />FLOORS, AND <br />4. A MONITORING SYSTEM TO VERIFY THESE PROJECTIONS. <br />STATUS: Complied with 10/15/99. Stipulation No. 9 has been satisfied by approval of PR-O1. <br />STIPULATION NO. 10 <br />NO SURFACE COAL MINING OPERATIONS SHALL BE CONDUCTED ON FEDREAL LEASE <br />C-0114093 UNTIL THE SECRETARY OF THE INTERIOR HAS APPROVED THE MINING <br />PLAN. THE DIVISION RESERVES THE RIGHT TO MODIFY THE PERMIT, WHEN <br />APPROPRIATE, IN ORDER TO RESOLVE CONFLICTS BETWEEN THE PERMIT <br />REQUIREMENTS AND THE REQUIREMENTS OF OTHER LAWS, RULES, AND <br />REGULATIONS ADMINISTERED BY THE SECRETARY OF THE INTERIOR. <br />STATUS: Complied with. Stipulation No. 10 has been satisfied by the approval of the federal <br />mining plan on 09/06/95. <br />STIPULATION NO. 11 <br />PRIOR TO INSTALLATION OF DRAGLINE DEADHEAD RAOD PERMANENT DRAINAGE, <br />SENECA COAL COMPANY SHALL CONSTRUCT KEY CUTS ABOVE AND BELOW THE <br />RECONSTRUCTED DRAINAGE TO THE MINIMUM SPECIFICATIONS OF 3' DEEP AND 5' <br />ACROSS THE WIDTH OF THE CHANNEL. SCC SHALL ALSO PLACE A GRANULAR <br />FILTER LAYER OR GEOTEXTILE FII.TER FABRIC IN THE ENTIRE RECONSTRUCTED <br />DRAINAGE CHANNEL PRIOR TO PALCEMENT OF THE ROCK RIPRAP. <br />STATUS: Complied with. Stipulation No. 11 was satisfied by construction of the required <br />drainage amendments and approved on inspection on 01/15/97. <br />STIPULATION NO. 12 <br />SENECA COAL COMPANY SHALL SUBMIT A RECLAMATION PLAN IN THE FORM OF A <br />REVISION FOR THE TOPSOIL PILES LOCATED AT THE YOAST MINE ENTRANCE HAUL <br />ROAD BY OCTOBER 15, 1996. <br />STATUS: Complied with 05/30/97. This stipulation was satisfied by the use of the topsoil and <br />elimination of the pile in February 1997, and by approval of TR-05. <br />Yout Mine 5 March 6, 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.