Laserfiche WebLink
3. WHETHER MINING OPERATIONS WILL RESULT IN MATERIAL DAMAGE <br />TO THE QUALITY OF SURFACE WATER SUPPLYING THE ALLUVIAL VALLEY <br />FLOORS, AND <br />4. A MONITORING SYSTEM TO VERIFY THESE PROJECTIONS. <br />STATUS: Complied with 10/15/99. Stipulation No. 9 has been satisfied by approval of PR-O1. <br />STIPULATION NO. 10 <br />NO SURFACE COAL MINING OPERATIONS SHALL BE CONDUCTED ON FEDREAL LEASE <br />C-0114093 UNTIL THE SECRETARY OF THE INTERIOR HAS APPROVED THE MINING <br />PLAN. THE DIVISION RESERVES THE RIGHT TO MODIFY THE PERMIT, WHEN <br />APPROPRIATE, IN ORDER TO RESOLVE CONFLICTS BETWEEN THE PERMIT <br />REQUIREMENTS AND THE REQUIREMENTS OF OTHER LAWS, RULES, AND <br />REGULATIONS ADMINISTERED BY THE SECRETARY OF THE INTERIOR. <br />STATUS: Complied with. Stipulation No. 10 has been satisfied by the approval of the federal <br />mining plan on 09/06/95. <br />STIPULATION NO. 11 <br />PRIOR TO INSTALLATION OF DRAGLINE DEADHEAD RAOD PERMANENT DRAINAGE, <br />SENECA COAL COMPANY SHALL CONSTRUCT KEY CUTS ABOVE AND BELOW THE <br />RECONSTRUCTED DRAINAGE TO THE MINIMUM SPECIFICATIONS OF 3' DEEP AND 5' <br />ACROSS THE WIDTH OF THE CHANNEL. SCC SHALL ALSO PLACE A GRANULAR <br />FILTER LAYER OR GEOTEXTILE FII.TER FABRIC IN THE ENTIRE RECONSTRUCTED <br />DRAINAGE CHANNEL PRIOR TO PALCEMENT OF THE ROCK RIPRAP. <br />STATUS: Complied with. Stipulation No. 11 was satisfied by construction of the required <br />drainage amendments and approved on inspection on 01/15/97. <br />STIPULATION NO. 12 <br />SENECA COAL COMPANY SHALL SUBMIT A RECLAMATION PLAN IN THE FORM OF A <br />REVISION FOR THE TOPSOIL PILES LOCATED AT THE YOAST MINE ENTRANCE HAUL <br />ROAD BY OCTOBER 15, 1996. <br />STATUS: Complied with 05/30/97. This stipulation was satisfied by the use of the topsoil and <br />elimination of the pile in February 1997, and by approval of TR-05. <br />Yout Mine 5 March 6, 2001 <br />