Laserfiche WebLink
<br />Minor Revisions Summary <br />con inued <br /> <br />MR51 Substation installation Approved 05/30/90 <br />MR52 Lube station monitor wells Approved 07/05/90 <br />MR53 Topsoil removal for drainage work, Area 61 Approved 07/12/90 <br />MR54 Topsoil pile access route Approved 07/17/90 <br />MR55 Percolation test for leach field Approved 08/21/90 <br />MR56 Stoker pad drainage control Approved 08/28/90 <br />MR57 Pond T small area exemption ana ditch F-4 Approved 09/14/90 <br />MR58 Hydrologic monitoring plan Approved 10/10/90 <br />MR59 Haul road B expansion Approved 09/13/90 <br />MR60 Haul road c upgrade Approved 09/24/90 <br /> <br />-6- <br />