<br />,~16. The operator will submit the infiormation requested in the Division letter <br />of August 10, 1988, under subheading "Area 51 East", so that the proposed <br />changes pertaining to the Area 51 East channel can be approved prior to <br />initiation of the final regrading of areas 26 and 51 east. <br />/17. Submit the appropriate revised pages, maps and/or figures, as required by <br />the field approval of minor revision 37, no later than May 12, 1985. <br />c~18. Are"vision to add the area just south of Pond K as a small area exemption <br />must be submitted by October 15, 1989. The submittal shall include three <br />copies of a proper technical revision which addresses the small area <br />exemption status. <br />U19. The operator will conduct operations in compliance with the conditions <br />recommended by the U. S. Fish and Wildlife Service, and the Bureau of Land <br />Management, pertaining to activities located in the 100 toot buffer zone <br />associated with Lease C-26914. <br />20. The operator will revise all permit maps to show the revised permit <br />boundary, and will submit revised legal description pages which reflect <br />the revised permit boundary as part of the midterm review response. <br />Stipulations 1, 2, and 3 are active stipulations. <br />Stipulation 11 may have been resolved; however, we cannot find any specific <br />documentation. Please provide information which will allow us to terminate <br />this stipulation. <br />Stipulation 12 was resolved with a Division letter from DAvid Berry to Rick <br />Mills dated February 9, 1989. <br />Stipulation 13 was resolved with the approval of Technical Revision number 26. <br />Stipulation 14 was resolved with the approval of Technical Revision No. 16. <br />The language was added to Permit Page 780-213(a). <br />Stipulation 16 was resolved with the operator submittal received September 27, <br />1988. '~ <br />Stipulation 17 was resolved with the submittal of minor revision 37 materials <br />dated May 10, 1989. <br />Stipulation 18 was resolved with the submittal and subsequent approval of <br />Technical Revision No. 27. <br />Stipulation 19 is an active stipulation, and it will be terminated if all <br />reclamation of the buffer zone is completed by Gctober 15, 1990. ISee <br />Technical Revision 2$.) <br />Stipulation 2U is an active stipulation, and it will be terminated with the <br />adequate response to this mid-term review. (See Technical Revision 28.) <br />_17_ <br />