My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33264
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:20 PM
Creation date
11/23/2007 7:35:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
5/7/2001
Doc Name
INTEROFFICE MEMORANDUM ROADSIDE PORTALS RECLAMATION COST ESTIMATE REMAINING RECLMATION
From
DMG
To
DAN MATHEWS
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 07-May-2001 Permit or job no.: C-81-041 <br />User : JRS Abbreviation : none <br />Task : OOb Filename : C041-006 <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Permit or job action :Remaining Reclamation at Roadside Portals <br />Task description :Direct Costs Page 2 of 3 -Tasks 040-078 <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />040 -Move Topsoil from Borrow Area to Roadside Area scraped 4 35.9 $24,471 <br />04 i -Replace Topsoil at Borrow Area scraped 4 1.6 $1, 117 <br /> <br />043 -Replace Topsoil /rom Stockpile to Ovedand Conveyor Area scraped 4 4.9 $3,377 <br />044 -Replace Topsoil /rom Stockpile to Railroad Spur Area scraped 4 2.5 $1,736 <br />045 -Replace Topsoil /rom Stockpile to Unit Train Loadout scraped 4 35.8 $24,433 <br />046 -Replace Topsoil /rom Stockpile 2 to CRDA #1 scraped 4 19.6 $13,367 <br />047 -Replace Topsoil Irom Stockpile 2 to CRDA #Z scraped 4 31.8 $21,652 <br />048 -Replace Topsoil from Stockpile 9 to CRDA #2 scraped 4 1.3 $923 <br />049 -Replace Topsoil from Stockpile 1 to North Portal Area scraped 4 16.0 $10.906 <br />050 -Replace Topsoil from Stockpile 3 to North Portal Area scraped 4 4.5 $3,097 <br />051 -Strip Topsoil at CBA-2 scraper( 4 4.81 $3,273 <br />052 -Replace Topsoil /rom Stockpile to CBA-2 scraped 4 4.81 $3,273 <br /> <br /> <br />055 -Seal Portals and Sha/ts mineseal 1 24.0 $7,620 <br />056 -Seal and Plug All Boreholes borehole 1 36.0 $2,139 <br />057 -Drill Seed Areas Where Topsoil Was Replaced revege 1 280.0 $225,375 <br />058 -Broadcast Seed revege 1 193.2 $256,010 <br />059 -Rip/Scarify A!I Areas Prior to Topsoil Replacement dozer 4 15.11 $9,316 <br />060 -BacMill and Topsoil Pond 11 dozer 4 10.7 $6,156 <br /> <br /> <br />063 -Haul Footprint of Coal Stockpile to CRDA #2 truckl 1 51.4 $30.216 <br />064 -Haul Footprint of Roadside Raw Coal Stockpile to CRDA #2 truckl i 17.0 $10,060 <br />065 -Regrade Access Road #4 dozer 4 2.9 $1,700 <br />066 -Rip Access Road #4 dozer 4 0.2 $129 <br />067 -Regrade East Collection Ditch dozer 4 0.61 $347 <br />068 -Regrade CBA #1 Sump dozer 4 0.4 $263 <br />069 -Remove Temporary Access Road#f0 dozer 4 2.5 $1,446 <br />070 -Rip Temporary Access Road #10 dozer 4 0.1 $61 <br />071 -Haul Roadside North Coal Footprint to CRDA #2 truckl 1 12.3 $7,196 <br />072 -Haul Roadside North Gob Pile to CRDA #2 truckl 1 8.9 $5,217 <br />073 -Haul and Place Rocks from CBA-2 to CRDA #1 & 2 truckl 1 8.9 $4,535 <br />074 -Salvage Topsoil Irom Drill Pad Slot (TR-35) dozer 4 0.6 $375 <br />075 -Cut Orill Pad Slot (TR-33) dozer 4 2.1 $1, i90 <br />076 -Drill200 Foot Dewatering Wel/ at 40 Degree Angle drilling 1 40.0 $75,000 <br />077 -Adding 180 Feet of Dewatering Pipe mist-eqp 1 8.0 $2,220 <br />078 -Silt Fence for Sediment Control at Pad (TR-33) mist-eqp 1 2.0 $209 <br />SUBTOTALS : 881.4 5758,405 <br />Site :Roadside Portals <br />State :Colorado <br />County :Mesa <br />
The URL can be used to link to this page
Your browser does not support the video tag.