My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33264
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:20 PM
Creation date
11/23/2007 7:35:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
5/7/2001
Doc Name
INTEROFFICE MEMORANDUM ROADSIDE PORTALS RECLAMATION COST ESTIMATE REMAINING RECLMATION
From
DMG
To
DAN MATHEWS
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />Date : 07-May-2001 Permit or job no.: C-81-041 <br />User: JRS Abbreviation: none <br />Task: OOa Filename: C041-OOa <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Permit or job action :Remaining Reclamation at Roadside Portals <br />Task description :Direct Costs Page 1 0/ 3 -Tasks 001-039 <br />Site :Roadside Portals <br />State :Colorado <br />County :Mesa <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Scrape Topsoil oN Upper RDRSA to Lower Area dozer 4 8.4 $4,857 <br />002 -Relocate Reluse to Create New Benches scraperl 4 108.0 $73,557 <br />003 -Haul Topsoil and Overburden from Lower Parking Area to RSRDA scraperl 4 19.1 $13,042 <br />004 -Regrade Portal & Access Road Material to Highwall dozer 4 235.5 $135, 796 <br />005 -Regrade Material Around Lower Parking Area dozer 4 147.4 $84,640 <br /> <br /> <br /> <br /> <br /> <br />011 -Backlill/Regrade Railroad Spur Area scraperl 4 5.4 $3,707 <br />012 -Backlill/Regrade Unit Train Loadout Area scraperl 4 130.8 $89, 070 <br />013 -Regrade Cameo Mine Facilities Area dozer 4 384.2 $220,516 <br />014 -Compact Reluse at CRDA #2 compact 1 35.3 $4,231 <br />075 -Regrade any Ungraded Reluse at CRDA #2 compact 1 35.3 $4,231 <br />016 -Haul Cover from CBA-2 to CRDA #1 truckl i 97.7 $57,993 <br />017 -Haul Cover from CBA-2 to CRDA #2 truckl 1 91.2 $67,086 <br />018 -Haul Cover lrom Stockpile 3 to CRDA #2 truckl 1 31.9 $23,488 <br />019 -Haul Cover from Stockpile 8 to CRDA #2 truckl 1 22.4 $14,909 <br />020 -Haul Cover from Coal Creek to CRDA #2 truckl 1 9.4 $6,882 <br />021 -Rip Roadside Mine Facilities Area (Paved Areas) dozer 4 2.9 $1.836 <br />022 -Rip Facilities Area and Light Use Roads (All Areas) dozer 4 67.7 $41,761 <br /> <br />024 -Rip CBA-2 dozer 4 10.1 $6,269 <br />025 -Finish Grade Steep Slopes at Roadside, CRDA 1&2 dozer 4 49.8 $28,611 <br />026 -Finish Grade All Level and Gently Sloping Areas grader i 1077 $11,723 <br />027 -Regrade CRDA #1 Access Road dozer 4 2.0 $1,185 <br />028 -Regrade Sediment Ponds 8 and 9 dozer 4 13.41 $7,698 <br />029 -BacMillPond7 dozer 4 1.7 $1,026 <br />030 -Regrade South Diversion Ditch at Roadside Mine dozer 4 1.5 $904 <br />031 -Backfill North Decline Diversion Ditches and Berms dozer 4 1.0 $593 <br />032 -Backfill Ponds 7 and 2 dozer 4 8.7 $5,017 <br />033 -Backlill and Topsoil Pond 4 of Cameo Mine dozer 4 74 $4,268 <br />034 -Back/ill and Topsoil Pond 5 at Cameo Mine dozer 4 5.3 $3.083 <br />035 -Backtill East and West Diversion Ditches at Cameo Mine dozer 4 0.5 $335 <br />036 -Backtill and Topsoil Pond 6 at CRDA #1 dozer 4 5.7 $3,310 <br />037 -BacMill and Topsoil Pond 70 at CRDA #2 dozer 4 4.9 $2.814 <br />038 -Backlill Runoff Containment Ditches at CRDA #2 dozer 4 1.8 $1,059 <br />039 -Strip Topsoil /rom Borrow Area scraperl 4 21.5 $14,690 <br />SUBTOTALS : 1,677.3 $939,587 <br />
The URL can be used to link to this page
Your browser does not support the video tag.