Laserfiche WebLink
Pikeview Quarry -Decision Notice and FONSI 08/30/01 <br />Pate 13 <br />CONTEXT <br />The approved alternative, Alternative B, will impact approximately 26 acres of National <br />Forest land, in the northern half of the currently disturbed site. The southern, steeper <br />portion of the site will remain unchanged from what it is today. <br />The operational period for this project will last up to 12 yeazs beginning in the fall of the <br />year 2001. Reclamation and monitoring activities are expected to extend beyond that <br />period. The Special Use Permit for the operation and reclamation of the quarry will <br />expire on I?ecember 31, 2021 The additional length of time added to the permit would <br />be to insure satisfactory reclamation has occurred. <br />INTENSITY <br />The physical and biological effects of this action will be confined primarily to the area <br />occupied by the Pikeview Quarry, but it is expected that environmental benefits <br />associated with the reduction of erosion and sedimentation will extend to downstream <br />areas that are outside of the reclaimed area. Adverse effects on soils, water, air, wildlife, <br />recreation and vegetation are judged to be not significant due to the temporary nature <br />small scale of the operation impacts, and mitigation and monitoring measures required <br />(as delineated in Chapter 5 of the EA). The long-term beneficial effects to soils, <br />hydrology, water and air quality, wetlands, aquatic habitat,.vegetation, wildlife and scenic <br />resources will be potentially significant. <br />A variety of mitigation requirements for this project will insure that the proposed <br />improvements are implemented in a manner that will minimise operation impacts. <br />Monitoring requirements will be designed to insure that the proposed improvements are <br />effective and functioning as intended to reduce erosion and sedimentation. <br />This project will result in significant improvements in the aesthetic chazacteristics of the <br />geographic azea, and will most likely induce further reclamation operations in the region. <br />The project will result in short term impacts, but the long-term benefits are substantial. <br />The envirotmtental effects are not scientifically or technically controversial, do not <br />involve umFlue or unknown risks, nor are the environmental effects highly uncertain. <br />Alternative B does not establish a precedent for future actions with significant effects, nor <br />does it represent a decision in principle about a future consideration. <br />Implementing this alternative, and other existing or foreseeable actions on or adjacent to <br />the area, does not cause a significant cumulative effect. <br />Based on a cultural resources inventory of the site of the proposed project conducted by <br />Dr. Andrea I. Gerstle on July 8, 2000, in compliance with the USDA Forest Service <br />requirements regarding Section 106 of the National Historic Preservation Act, Alternative <br />B would not affect any cultural resource on National Forest System land. <br />